How it's worked out
Every number here comes from Network Rail's own delay attribution files, summed up and nothing else. Here's exactly what's counted, so you can check it, quote it or pick holes in it.
What a delay minute is
Network Rail logs every time a train loses time against its timetable and puts a cause on it. We count those delay events (automatic and manual delay reports) on the 24 passenger operators in ORR's tables, which is how ORR counts them. Freight, charters, Eurostar and the Underground's trains are in the files too and stay out.
The files also give cancelled trains a number of minutes, but those are deemed, not lost, and Network Rail's own guide says counting them as delay is misleading. So cancellations are counted as trains: each train cancelled in full or in part is one train, under the incident that caused it. A cancellation nobody's put down to an incident isn't counted, since it has no cause.
Where the delay is recorded
Station pages use where the train lost the time, which Network Rail calls the location of the delay, not the incident. That's a station or the run from it to the next timing point: about half of it is at the station itself and a fifth is on runs of 10 km or more. Delay recorded somewhere that isn't a station (a junction or a signal) stays off station pages but counts on the route and operator pages.
The map uses where each incident was instead, so a failed signal shows where it failed even though the trains it held up were late all over the place.
Knock-on delay
About two thirds of all delay is knock-on (Network Rail says reactionary): a train held up because another train was late first. It's put down to the incident that started it, so a signal failure at Reading can explain minutes lost at Paddington. Each page says how much of its delay was knock-on.
The causes
ORR's own groups, which the glossary tags every reason code with, with autumn split out of weather. Network Rail's causes first, then the operators'. Whose cause it is comes from who the delay was attributed to, not what kind of thing went wrong.
- Track
- Broken rails, track defects, track circuits and the like. ORR calls it Track.
- Signals, points and power
- Signals, points, power supply, overhead wires and telecoms. ORR calls it Non-track assets.
- Weather and structures
- Storms, flooding, heat, snow, and bridges, tunnels and earthworks. ORR calls it Severe weather, autumn and structures.
- Autumn
- Leaves on the line, poor railhead adhesion and autumn working. ORR calls it Severe weather, autumn and structures.
- External
- Vandalism, cable theft, animals, fires, level crossings and security alerts. ORR calls it External.
- Network management
- Timetabling, signallers, possessions and planning. ORR calls it Network management/other.
- Train faults
- Train faults and the depots that maintain them. ORR calls it Fleet.
- Traincrew
- Drivers and guards: shortages, late turn-ups and errors. ORR calls it Traincrew.
- Stations
- Dispatch, passenger loading and station staff. ORR calls it Stations.
- Operations
- Control decisions, stock and crew planning, and operating errors. ORR calls it Operations.
- Operator, other
- Anything else the operator's responsible for. ORR calls it TOC other.
Comparing with other years
Each cause is read against the same period in other years, per day since periods run from 25 to 32 days, leaving out 2020-21 when lockdown timetables ran. It's shown as where this year sits among the others and never as "X% worse than normal": more trains mean more minutes, and the files can't say how many ran. A station averaging under 100 delay minutes a period gets its numbers but no comparison.
Still being agreed
Network Rail and the operators can dispute who caused a delay, and a period's first release can have a lot still open. Every file says how much of its delay was agreed, and every figure here carries that share. Periods under 94% agreed are drawn hatched or faded. Nothing's called final, and a re-release of a period replaces the old one.
What's left out, and why
Incidents involving people: fatalities, trespass (which is also where people in crisis on the line get coded), welfare concerns and disorder, police searching the line or a train, and ill or injured passengers. They're between a tenth and an eighth of delay. They're taken out by incident before anything is summed, knock-on and all, and appear only as one network total a period on the trends page. Nothing below the whole network is shown by day either, so no figure can point at a day and a place. This follows Samaritans' media guidance.
The map can only draw a section of line with a station at one end or both, so the delay that starts at junctions and sidings with no station at either end (14% of it since 2018) isn't on it, though it's in every route and operator total. The map says how much it's leaving off for whatever you've picked.
Routes and operators
Routes are today's Network Rail routes from the glossary, applied to every year. Operators keep their codes when franchises change hands, so Avanti West Coast's page includes Virgin's West Coast years, and each operator page names who ran it before.
Checking it against ORR
Each new file is checked against ORR's Table 3184 before it goes up. For the operators that only run on Network Rail's track, our totals have to land within 2% of ORR's, and on a period at least 94% agreed, nine in ten of their causes over 500 minutes have to land within 10%. The Elizabeth line, Heathrow Express, Chiltern, Transport for Wales, London Overground and Southeastern run partly off Network Rail's track, which ORR leaves out and the files don't, so they come out higher and aren't held to it. A file that fails stays out until someone's looked at why.
Sources
- Historic Delay Attribution, Network Rail. Every delay and cancellation with its cause, 2018-19 P01 to 2023-24 P09. The older files come from Network Rail's own public download area, newer ones from the Rail Data Marketplace. Open Government Licence v3.0. Last taken 25 November 2026.
- Table 3184: delay minutes by operator and cause, periodic, Office of Rail and Road. Used to check our totals, and drawn on its own in the trends for periods we have no file for. Open Government Licence v3.0. Last taken 25 November 2026.
- NaPTAN, national rail stations, Department for Transport. Where each station is, matched to the glossary by its three-letter code. Open Government Licence v3.0. Last taken 25 November 2026.
- Map tiles from OpenFreeMap, map data © OpenStreetMap contributors.
This site isn't Network Rail or ORR, and neither has endorsed it. Every page's numbers are a CSV beside it, and the period rollups behind them are in the repo.