73,809 delay minutes
The biggest share (23%) of the delay picked up by Avanti West Coast trains in the four weeks to 9 December 2023 came from signal, points and power faults.
67% of these minutes were knock-on from something that happened elsewhere first. 88% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 2,883 | 4% | 8% | 103 a day, more than 1 of the other 4 years | - |
| Signals, points and power | 17,125 | 23% | 16% | 612 a day, the most in 5 years | 78 |
| Weather and structures | 3,985 | 5% | 7% | 142 a day, more than 1 of the other 4 years | 5 |
| Autumn | 1,010 | 1% | 7% | 36 a day, the most in 5 years | - |
| External | 595 | <1% | 4% | 21 a day, the least in 5 years | - |
| Network management | 14,848 | 20% | 17% | 530 a day, the most in 5 years | 505 |
| The operators' causes | |||||
| Train faults | 16,085 | 22% | 16% | 574 a day, the most in 5 years | 101 |
| Traincrew | 9,879 | 13% | 11% | 353 a day, the most in 5 years | 608 |
| Stations | 1,663 | 2% | 3% | 59 a day, more than 2 of the other 4 years | 2 |
| Operations | 2,488 | 3% | 5% | 89 a day, the most in 5 years | 18 |
| Operator, other | 3,250 | 4% | 7% | 116 a day, more than 3 of the other 4 years | 1 |
Period by period
Whose fault, since 2018
- Their own
- 20% (591,809 minutes)
- Network Rail's
- 62% (1,894,481 minutes)
- Other operators' trains
- 18% (545,743 minutes)
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 8,116 |
| IH | Power Supply And Distribution System Failure | 7,041 |
| JP | Failure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards | 3,928 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 2,967 |
| IB | Points failure (including no fault found) | 2,892 |
| M1 | Confirmed Pantograph ADD, associated system faults, positive PANCHEX activations and train borne power switch over systems (AC) | 2,879 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 2,750 |
| JL | Safety related incident caused by maintenance or infrastructure staff oversight or error (not Operations staff) | 2,700 |
| M8 | Technical failures above the Solebar | 2,320 |
| X2 | Severe flooding beyond that which could be mitigated on Network Rail infrastructure | 1,988 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 189,998 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 154,435 |
| I1 | Overhead line/third rail defect | 132,421 |
| IB | Points failure (including no fault found) | 126,965 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 121,472 |
| M8 | Technical failures above the Solebar | 98,348 |
| MD | Technical failures below the solebar | 80,559 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 79,962 |
| J3 | Axle Counter Failure | 73,771 |