73,809 delay minutes

The biggest share (23%) of the delay picked up by Avanti West Coast trains in the four weeks to 9 December 2023 came from signal, points and power faults.

67% of these minutes were knock-on from something that happened elsewhere first. 88% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track2,8834%8% 103 a day, more than 1 of the other 4 years-
Signals, points and power17,12523%16% 612 a day, the most in 5 years78
Weather and structures3,9855%7% 142 a day, more than 1 of the other 4 years5
Autumn1,0101%7% 36 a day, the most in 5 years-
External595<1%4% 21 a day, the least in 5 years-
Network management14,84820%17% 530 a day, the most in 5 years505
The operators' causes
Train faults16,08522%16% 574 a day, the most in 5 years101
Traincrew9,87913%11% 353 a day, the most in 5 years608
Stations1,6632%3% 59 a day, more than 2 of the other 4 years2
Operations2,4883%5% 89 a day, the most in 5 years18
Operator, other3,2504%7% 116 a day, more than 3 of the other 4 years1

Period by period

Delay minutes a day, period by period. Gridlines every 1,000 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

Whose fault, since 2018

Their own
20% (591,809 minutes)
Network Rail's
62% (1,894,481 minutes)
Other operators' trains
18% (545,743 minutes)

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
TGDriver8,116
IHPower Supply And Distribution System Failure7,041
JPFailure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards3,928
MNBrake and brake systems faults; including wheel flats where no other cause had been identified2,967
IBPoints failure (including no fault found)2,892
M1Confirmed Pantograph ADD, associated system faults, positive PANCHEX activations and train borne power switch over systems (AC)2,879
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure2,750
JLSafety related incident caused by maintenance or infrastructure staff oversight or error (not Operations staff)2,700
M8Technical failures above the Solebar2,320
X2Severe flooding beyond that which could be mitigated on Network Rail infrastructure1,988
Since 2018
CodeWhat Network Rail loggedMinutes
TGDriver189,998
IRBroken/cracked/twisted/buckled/flawed rail154,435
I1Overhead line/third rail defect132,421
IBPoints failure (including no fault found)126,965
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.121,472
M8Technical failures above the Solebar98,348
MDTechnical failures below the solebar80,559
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure79,962
J3Axle Counter Failure73,771
TH(Senior) Conductor/Train Manager66,275