c2c
4,110 delay minutes
The biggest share (23%) of the delay picked up by c2c trains in the four weeks to 9 December 2023 came from how the network was run.
57% of these minutes were knock-on from something that happened elsewhere first. 94% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 525 | 13% | 8% | 19 a day, the least in 5 years | - |
| Signals, points and power | 468 | 11% | 16% | 17 a day, more than 1 of the other 4 years | 4 |
| Weather and structures | - | - | 7% | 0 a day, the least in 5 years | - |
| Autumn | 56 | 1% | 7% | 2 a day, the most in 5 years | - |
| External | 61 | 1% | 4% | 2 a day, the least in 5 years | - |
| Network management | 939 | 23% | 17% | 34 a day, the most in 5 years | 44 |
| The operators' causes | |||||
| Train faults | 685 | 17% | 16% | 24 a day, more than 3 of the other 4 years | 23 |
| Traincrew | 656 | 16% | 11% | 23 a day, the most in 5 years | 19 |
| Stations | 108 | 3% | 3% | 4 a day, the least in 5 years | - |
| Operations | 112 | 3% | 5% | 4 a day, more than 1 of the other 4 years | - |
| Operator, other | 501 | 12% | 7% | 18 a day, more than 3 of the other 4 years | 2 |
Period by period
Whose fault, since 2018
- Their own
- 28% (99,472 minutes)
- Network Rail's
- 68% (244,880 minutes)
- Other operators' trains
- 4% (16,000 minutes)
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 525 |
| TG | Driver | 434 |
| JX | Miscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains) | 432 |
| VH | Passenger Communication cord, door egress or emergency train alarm operated | 424 |
| M8 | Technical failures above the Solebar | 266 |
| MU | Depot operating problem | 151 |
| MD | Technical failures below the solebar | 136 |
| FC | Freight Train Driver error, SPAD, Wrong routing or Missed AWS/DSD [No change] | 126 |
| IB | Points failure (including no fault found) | 123 |
| ID | Level crossing faults and failure incl. barrow/foot crossings and crossing treadles | 107 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 31,336 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 19,120 |
| TG | Driver | 19,038 |
| IV | Cutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure) | 13,987 |
| VH | Passenger Communication cord, door egress or emergency train alarm operated | 9,911 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 9,850 |
| M8 | Technical failures above the Solebar | 8,723 |
| I1 | Overhead line/third rail defect | 8,302 |
| XW | Severe weather not snow affecting infrastructure the responsibility of Network Rail | 8,051 |
| IC | Track circuit failure (including no fault found) | 7,440 |