4,110 delay minutes

The biggest share (23%) of the delay picked up by c2c trains in the four weeks to 9 December 2023 came from how the network was run.

57% of these minutes were knock-on from something that happened elsewhere first. 94% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track52513%8% 19 a day, the least in 5 years-
Signals, points and power46811%16% 17 a day, more than 1 of the other 4 years4
Weather and structures--7% 0 a day, the least in 5 years-
Autumn561%7% 2 a day, the most in 5 years-
External611%4% 2 a day, the least in 5 years-
Network management93923%17% 34 a day, the most in 5 years44
The operators' causes
Train faults68517%16% 24 a day, more than 3 of the other 4 years23
Traincrew65616%11% 23 a day, the most in 5 years19
Stations1083%3% 4 a day, the least in 5 years-
Operations1123%5% 4 a day, more than 1 of the other 4 years-
Operator, other50112%7% 18 a day, more than 3 of the other 4 years2

Period by period

Delay minutes a day, period by period. Gridlines every 100 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

Whose fault, since 2018

Their own
28% (99,472 minutes)
Network Rail's
68% (244,880 minutes)
Other operators' trains
4% (16,000 minutes)

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.525
TGDriver434
JXMiscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains)432
VHPassenger Communication cord, door egress or emergency train alarm operated424
M8Technical failures above the Solebar266
MUDepot operating problem151
MDTechnical failures below the solebar136
FCFreight Train Driver error, SPAD, Wrong routing or Missed AWS/DSD [No change]126
IBPoints failure (including no fault found)123
IDLevel crossing faults and failure incl. barrow/foot crossings and crossing treadles107
Since 2018
CodeWhat Network Rail loggedMinutes
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.31,336
IRBroken/cracked/twisted/buckled/flawed rail19,120
TGDriver19,038
IVCutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure)13,987
VHPassenger Communication cord, door egress or emergency train alarm operated9,911
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure9,850
M8Technical failures above the Solebar8,723
I1Overhead line/third rail defect8,302
XWSevere weather not snow affecting infrastructure the responsibility of Network Rail8,051
ICTrack circuit failure (including no fault found)7,440