15,559 delay minutes

The biggest share (21%) of the delay picked up by Chiltern Railways trains in the four weeks to 9 December 2023 came from faulty trains.

41% of these minutes were knock-on from something that happened elsewhere first. 98% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track1,93612%8% 69 a day, more than 3 of the other 4 years-
Signals, points and power1,82612%16% 65 a day, more than 1 of the other 4 years4
Weather and structures47<1%7% 2 a day, the least in 5 years-
Autumn1,0227%7% 36 a day, more than 3 of the other 4 years6
External6594%4% 24 a day, more than 3 of the other 4 years8
Network management1,4539%17% 52 a day, the least in 5 years36
The operators' causes
Train faults3,26121%16% 116 a day, more than 1 of the other 4 years37
Traincrew1,2848%11% 46 a day, the least in 5 years46
Stations4183%3% 15 a day, the least in 5 years-
Operations2,93519%5% 105 a day, more than 1 of the other 4 years63
Operator, other7205%7% 26 a day, more than 1 of the other 4 years2

Period by period

Delay minutes a day, period by period. Gridlines every 500 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

Whose fault, since 2018

Their own
41% (453,827 minutes)
Network Rail's
49% (537,744 minutes)
Other operators' trains
10% (113,469 minutes)

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
TXDelays incurred on non-Network Rail running lines or networks including London Underground (except fleet related delays)2,673
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.1,782
TGDriver981
MDTechnical failures below the solebar964
IBPoints failure (including no fault found)617
XPBRIDGE HIT612
M7Door and Door system faults582
QJSpecial working for leaf-fall track circuit operation531
M8Technical failures above the Solebar444
OSLate start or delays to Railhead Conditioning or Ghost Train due to its own activity and not in reaction to another incident353
Since 2018
CodeWhat Network Rail loggedMinutes
TXDelays incurred on non-Network Rail running lines or networks including London Underground (except fleet related delays)105,790
MDTechnical failures below the solebar80,078
TGDriver72,556
ICTrack circuit failure (including no fault found)48,701
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.45,734
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)39,855
M8Technical failures above the Solebar32,746
IBPoints failure (including no fault found)30,530
MCDiesel Loco failure, defect, attention27,920
MNBrake and brake systems faults; including wheel flats where no other cause had been identified24,674