Elizabeth line
39,806 delay minutes
The biggest share (29%) of the delay picked up by Elizabeth line trains in the four weeks to 9 December 2023 came from the operators' own operations.
70% of these minutes were knock-on from something that happened elsewhere first. 77% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 4,909 | 12% | 8% | 175 a day, the most in 5 years | 149 |
| Signals, points and power | 4,068 | 10% | 16% | 145 a day, more than 3 of the other 4 years | 382 |
| Weather and structures | 167 | <1% | 7% | 6 a day, the most in 5 years | - |
| Autumn | 884 | 2% | 7% | 32 a day, the most in 5 years | - |
| External | 724 | 2% | 4% | 26 a day, the most in 5 years | 2 |
| Network management | 4,728 | 12% | 17% | 169 a day, the most in 5 years | 630 |
| The operators' causes | |||||
| Train faults | 8,108 | 20% | 16% | 290 a day, the most in 5 years | 231 |
| Traincrew | 1,322 | 3% | 11% | 47 a day, more than 3 of the other 4 years | 13 |
| Stations | 208 | <1% | 3% | 7 a day, the least in 5 years | - |
| Operations | 11,653 | 29% | 5% | 416 a day, more than 3 of the other 4 years | 538 |
| Operator, other | 3,037 | 8% | 7% | 108 a day, the most in 5 years | 35 |
Period by period
Whose fault, since 2018
- Their own
- 43% (366,169 minutes)
- Network Rail's
- 43% (365,908 minutes)
- Other operators' trains
- 13% (113,142 minutes)
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TX | Delays incurred on non-Network Rail running lines or networks including London Underground (except fleet related delays) | 11,289 |
| M2 | Delay due to ATO / ETCS equipment | 4,540 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 2,573 |
| I1 | Overhead line/third rail defect | 1,899 |
| OU | Delays not Investigated by Network Rail | 1,846 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 1,757 |
| IC | Track circuit failure (including no fault found) | 1,395 |
| TG | Driver | 1,142 |
| M0 | Confirmed train cab based safety system fault (including GSMR) | 896 |
| Q3 | NZ Pumps T | 821 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TX | Delays incurred on non-Network Rail running lines or networks including London Underground (except fleet related delays) | 156,625 |
| M2 | Delay due to ATO / ETCS equipment | 55,829 |
| IB | Points failure (including no fault found) | 38,877 |
| TG | Driver | 32,648 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 29,934 |
| M0 | Confirmed train cab based safety system fault (including GSMR) | 28,582 |
| M7 | Door and Door system faults | 23,902 |
| I1 | Overhead line/third rail defect | 23,415 |
| M8 | Technical failures above the Solebar | 20,352 |
| J3 | Axle Counter Failure | 19,806 |