Great Western Railway
174,316 delay minutes
The biggest share (18%) of the delay picked up by Great Western Railway trains in the four weeks to 9 December 2023 came from track faults.
68% of these minutes were knock-on from something that happened elsewhere first. 88% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 31,574 | 18% | 8% | 1,128 a day, the most in 5 years | 278 |
| Signals, points and power | 31,489 | 18% | 16% | 1,125 a day, more than 3 of the other 4 years | 352 |
| Weather and structures | 12,398 | 7% | 7% | 443 a day, the most in 5 years | 252 |
| Autumn | 6,439 | 4% | 7% | 230 a day, more than 2 of the other 4 years | 12 |
| External | 4,967 | 3% | 4% | 177 a day, the most in 5 years | 55 |
| Network management | 28,356 | 16% | 17% | 1,013 a day, the most in 5 years | 2,198 |
| The operators' causes | |||||
| Train faults | 27,485 | 16% | 16% | 982 a day, more than 3 of the other 4 years | 744 |
| Traincrew | 17,693 | 10% | 11% | 632 a day, the most in 5 years | 947 |
| Stations | 2,668 | 2% | 3% | 95 a day, more than 1 of the other 4 years | 6 |
| Operations | 4,400 | 3% | 5% | 157 a day, the most in 5 years | 48 |
| Operator, other | 6,849 | 4% | 7% | 245 a day, more than 2 of the other 4 years | 14 |
Period by period
Whose fault, since 2018
- Their own
- 28% (1,752,549 minutes)
- Network Rail's
- 61% (3,816,742 minutes)
- Other operators' trains
- 11% (677,096 minutes)
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 15,866 |
| TG | Driver | 14,600 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 11,870 |
| IB | Points failure (including no fault found) | 11,824 |
| OU | Delays not Investigated by Network Rail | 11,704 |
| X2 | Severe flooding beyond that which could be mitigated on Network Rail infrastructure | 5,417 |
| MS | Planned underpowered or shortformed service and or vehicle, incl. exam set swaps | 4,424 |
| M8 | Technical failures above the Solebar | 4,198 |
| IA | Signal failure (including no fault found) | 4,134 |
| MD | Technical failures below the solebar | 3,879 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 388,273 |
| MD | Technical failures below the solebar | 293,684 |
| IB | Points failure (including no fault found) | 283,619 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 273,657 |
| M8 | Technical failures above the Solebar | 192,602 |
| J3 | Axle Counter Failure | 189,040 |
| IC | Track circuit failure (including no fault found) | 181,843 |
| M7 | Door and Door system faults | 163,668 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 149,038 |
| ZU | No Cause Identified After investigation by both Parties | 148,066 |