Greater Anglia
33,698 delay minutes
The biggest share (24%) of the delay picked up by Greater Anglia trains in the four weeks to 9 December 2023 came from how the network was run.
65% of these minutes were knock-on from something that happened elsewhere first. 88% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 2,695 | 8% | 8% | 96 a day, the least in 5 years | 45 |
| Signals, points and power | 5,707 | 17% | 16% | 204 a day, more than 1 of the other 4 years | 52 |
| Weather and structures | 2,143 | 6% | 7% | 77 a day, more than 1 of the other 4 years | 3 |
| Autumn | 2,106 | 6% | 7% | 75 a day, more than 2 of the other 4 years | 4 |
| External | 2,779 | 8% | 4% | 99 a day, the most in 5 years | 22 |
| Network management | 8,051 | 24% | 17% | 288 a day, more than 1 of the other 4 years | 219 |
| The operators' causes | |||||
| Train faults | 3,901 | 12% | 16% | 139 a day, the least in 5 years | 72 |
| Traincrew | 1,463 | 4% | 11% | 52 a day, more than 1 of the other 4 years | 18 |
| Stations | 312 | <1% | 3% | 11 a day, the least in 5 years | - |
| Operations | 1,347 | 4% | 5% | 48 a day, more than 1 of the other 4 years | 14 |
| Operator, other | 3,195 | 9% | 7% | 114 a day, more than 2 of the other 4 years | 46 |
Period by period
Whose fault, since 2018
- Their own
- 24% (647,193 minutes)
- Network Rail's
- 66% (1,750,653 minutes)
- Other operators' trains
- 10% (272,627 minutes)
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 1,863 |
| XP | BRIDGE HIT | 1,715 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 1,615 |
| I2 | AC/DC trip (including no fault or cause found) | 1,612 |
| IV | Cutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure) | 1,487 |
| QJ | Special working for leaf-fall track circuit operation | 1,224 |
| VH | Passenger Communication cord, door egress or emergency train alarm operated | 1,173 |
| TG | Driver | 1,072 |
| OT | Ops Safety TSR implemented for sighting issues relating to foot crossings, level crossings or signals (Not vegetation caused) | 1,001 |
| M7 | Door and Door system faults | 975 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 298,977 |
| IV | Cutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure) | 109,574 |
| MD | Technical failures below the solebar | 108,830 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 100,665 |
| TG | Driver | 97,840 |
| M8 | Technical failures above the Solebar | 83,796 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 82,708 |
| IB | Points failure (including no fault found) | 77,827 |
| M7 | Door and Door system faults | 65,558 |
| IC | Track circuit failure (including no fault found) | 64,918 |