9,411 delay minutes

The biggest share (29%) of the delay picked up by Heathrow Express trains in the four weeks to 9 December 2023 came from track faults.

69% of these minutes were knock-on from something that happened elsewhere first. 69% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track2,77529%8% 99 a day, the most in 5 years4
Signals, points and power7478%16% 27 a day, more than 2 of the other 4 years90
Weather and structures1041%7% 4 a day, the most in 5 years-
Autumn38<1%7% 1 a day, more than 3 of the other 4 years-
External71<1%4% 3 a day, more than 2 of the other 4 years-
Network management1,75319%17% 63 a day, the most in 5 years35
The operators' causes
Train faults2,27224%16% 81 a day, the most in 5 years244
Traincrew8509%11% 30 a day, the most in 5 years23
Stations73<1%3% 3 a day, more than 3 of the other 4 years-
Operations4365%5% 16 a day, the most in 5 years5
Operator, other2923%7% 10 a day, more than 2 of the other 4 years5

Period by period

Delay minutes a day, period by period. Gridlines every 100 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

Whose fault, since 2018

Their own
32% (69,885 minutes)
Network Rail's
47% (103,240 minutes)
Other operators' trains
22% (48,411 minutes)

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
IRBroken/cracked/twisted/buckled/flawed rail1,451
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.1,201
OUDelays not Investigated by Network Rail1,169
M2Delay due to ATO / ETCS equipment1,034
TGDriver796
MTConfirmed train borne safety system faults (not cab based)499
TXDelays incurred on non-Network Rail running lines or networks including London Underground (except fleet related delays)346
ICTrack circuit failure (including no fault found)287
I1Overhead line/third rail defect226
IASignal failure (including no fault found)190
Since 2018
CodeWhat Network Rail loggedMinutes
M2Delay due to ATO / ETCS equipment39,124
TGDriver12,521
ICTrack circuit failure (including no fault found)10,912
IBPoints failure (including no fault found)9,717
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.8,667
IRBroken/cracked/twisted/buckled/flawed rail7,588
I1Overhead line/third rail defect7,348
M8Technical failures above the Solebar6,853
J3Axle Counter Failure6,487
M7Door and Door system faults6,465