Leaves on the Line

Hull Trains

CSV JSON

3,638 delay minutes

The biggest share (34%) of the delay picked up by Hull Trains trains in the four weeks to 9 December 2023 came from signal, points and power faults.

50% of these minutes were knock-on from something that happened elsewhere first. 82% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track2577%8% 9 a day, more than 1 of the other 4 years-
Signals, points and power1,24134%16% 44 a day, the most in 5 years6
Weather and structures1695%7% 6 a day, the most in 5 years-
Autumn44412%7% 16 a day, more than 3 of the other 4 years-
External2447%4% 9 a day, the most in 5 years-
Network management53815%17% 19 a day, more than 3 of the other 4 years49
The operators' causes
Train faults49414%16% 18 a day, more than 2 of the other 4 years1
Traincrew632%11% 2 a day, the least in 5 years-
Stations511%3% 2 a day, more than 2 of the other 4 years-
Operations702%5% 2 a day, more than 2 of the other 4 years1
Operator, other682%7% 2 a day, the least in 5 years-

Period by period

Delay minutes a day, period by period. Gridlines every 50 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

Whose fault, since 2018

Their own
13% (15,209 minutes)
Network Rail's
64% (72,996 minutes)
Other operators' trains
22% (25,532 minutes)

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
I1Overhead line/third rail defect861
QJSpecial working for leaf-fall track circuit operation412
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.202
OUDelays not Investigated by Network Rail170
M1Confirmed Pantograph ADD, associated system faults, positive PANCHEX activations and train borne power switch over systems (AC)162
XRCable vandalism or theft144
I8Animal Strike or Incursion within the control of Network Rail135
ICTrack circuit failure (including no fault found)125
MUDepot operating problem118
XWSevere weather not snow affecting infrastructure the responsibility of Network Rail102
Since 2018
CodeWhat Network Rail loggedMinutes
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.5,993
IBPoints failure (including no fault found)4,978
I1Overhead line/third rail defect4,688
MDTechnical failures below the solebar4,594
TGDriver4,334
IDLevel crossing faults and failure incl. barrow/foot crossings and crossing treadles3,262
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure2,878
M8Technical failures above the Solebar2,866
MNBrake and brake systems faults; including wheel flats where no other cause had been identified2,852
M1Confirmed Pantograph ADD, associated system faults, positive PANCHEX activations and train borne power switch over systems (AC)2,722