Hull Trains
3,638 delay minutes
The biggest share (34%) of the delay picked up by Hull Trains trains in the four weeks to 9 December 2023 came from signal, points and power faults.
50% of these minutes were knock-on from something that happened elsewhere first. 82% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 257 | 7% | 8% | 9 a day, more than 1 of the other 4 years | - |
| Signals, points and power | 1,241 | 34% | 16% | 44 a day, the most in 5 years | 6 |
| Weather and structures | 169 | 5% | 7% | 6 a day, the most in 5 years | - |
| Autumn | 444 | 12% | 7% | 16 a day, more than 3 of the other 4 years | - |
| External | 244 | 7% | 4% | 9 a day, the most in 5 years | - |
| Network management | 538 | 15% | 17% | 19 a day, more than 3 of the other 4 years | 49 |
| The operators' causes | |||||
| Train faults | 494 | 14% | 16% | 18 a day, more than 2 of the other 4 years | 1 |
| Traincrew | 63 | 2% | 11% | 2 a day, the least in 5 years | - |
| Stations | 51 | 1% | 3% | 2 a day, more than 2 of the other 4 years | - |
| Operations | 70 | 2% | 5% | 2 a day, more than 2 of the other 4 years | 1 |
| Operator, other | 68 | 2% | 7% | 2 a day, the least in 5 years | - |
Period by period
Whose fault, since 2018
- Their own
- 13% (15,209 minutes)
- Network Rail's
- 64% (72,996 minutes)
- Other operators' trains
- 22% (25,532 minutes)
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| I1 | Overhead line/third rail defect | 861 |
| QJ | Special working for leaf-fall track circuit operation | 412 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 202 |
| OU | Delays not Investigated by Network Rail | 170 |
| M1 | Confirmed Pantograph ADD, associated system faults, positive PANCHEX activations and train borne power switch over systems (AC) | 162 |
| XR | Cable vandalism or theft | 144 |
| I8 | Animal Strike or Incursion within the control of Network Rail | 135 |
| IC | Track circuit failure (including no fault found) | 125 |
| MU | Depot operating problem | 118 |
| XW | Severe weather not snow affecting infrastructure the responsibility of Network Rail | 102 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 5,993 |
| IB | Points failure (including no fault found) | 4,978 |
| I1 | Overhead line/third rail defect | 4,688 |
| MD | Technical failures below the solebar | 4,594 |
| TG | Driver | 4,334 |
| ID | Level crossing faults and failure incl. barrow/foot crossings and crossing treadles | 3,262 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 2,878 |
| M8 | Technical failures above the Solebar | 2,866 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 2,852 |
| M1 | Confirmed Pantograph ADD, associated system faults, positive PANCHEX activations and train borne power switch over systems (AC) | 2,722 |