Leaves on the Line

LNER

CSV JSON

43,772 delay minutes

The biggest share (28%) of the delay picked up by LNER trains in the four weeks to 9 December 2023 came from signal, points and power faults.

48% of these minutes were knock-on from something that happened elsewhere first. 78% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track3,3248%8% 119 a day, more than 1 of the other 4 years-
Signals, points and power12,28728%16% 439 a day, the most in 5 years74
Weather and structures7,03116%7% 251 a day, the most in 5 years62
Autumn1,3953%7% 50 a day, the most in 5 years-
External2,8527%4% 102 a day, more than 3 of the other 4 years9
Network management6,31814%17% 226 a day, more than 3 of the other 4 years270
The operators' causes
Train faults5,36812%16% 192 a day, more than 2 of the other 4 years31
Traincrew2,3585%11% 84 a day, more than 2 of the other 4 years31
Stations5621%3% 20 a day, more than 1 of the other 4 years-
Operations1,0092%5% 36 a day, more than 3 of the other 4 years2
Operator, other1,2703%7% 45 a day, more than 1 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 1,000 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

Whose fault, since 2018

Their own
22% (400,964 minutes)
Network Rail's
62% (1,110,863 minutes)
Other operators' trains
15% (274,324 minutes)

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
I1Overhead line/third rail defect8,637
IVCutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure)2,637
XWSevere weather not snow affecting infrastructure the responsibility of Network Rail2,448
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.2,302
TGDriver1,671
I8Animal Strike or Incursion within the control of Network Rail1,594
M1Confirmed Pantograph ADD, associated system faults, positive PANCHEX activations and train borne power switch over systems (AC)1,518
OUDelays not Investigated by Network Rail1,401
XRCable vandalism or theft1,273
I5Possession over-run from planned work939
Since 2018
CodeWhat Network Rail loggedMinutes
I1Overhead line/third rail defect106,209
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.76,480
IBPoints failure (including no fault found)69,391
TGDriver67,887
MNBrake and brake systems faults; including wheel flats where no other cause had been identified59,355
XWSevere weather not snow affecting infrastructure the responsibility of Network Rail57,331
MDTechnical failures below the solebar56,953
MBElectic Loco failure, defect, attention47,044
M8Technical failures above the Solebar44,544
M1Confirmed Pantograph ADD, associated system faults, positive PANCHEX activations and train borne power switch over systems (AC)43,882