30,600 delay minutes
The biggest share (19%) of the delay picked up by London Overground trains in the four weeks to 9 December 2023 came from how the network was run.
75% of these minutes were knock-on from something that happened elsewhere first. 95% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 3,241 | 11% | 8% | 116 a day, the most in 5 years | 190 |
| Signals, points and power | 4,799 | 16% | 16% | 171 a day, the most in 5 years | 282 |
| Weather and structures | 1,169 | 4% | 7% | 42 a day, more than 2 of the other 4 years | 36 |
| Autumn | 247 | <1% | 7% | 9 a day, more than 2 of the other 4 years | 1 |
| External | 1,642 | 5% | 4% | 59 a day, the most in 5 years | 90 |
| Network management | 5,675 | 19% | 17% | 203 a day, more than 2 of the other 4 years | 302 |
| The operators' causes | |||||
| Train faults | 2,909 | 10% | 16% | 104 a day, the least in 5 years | 204 |
| Traincrew | 2,815 | 9% | 11% | 101 a day, the least in 5 years | 80 |
| Stations | 2,057 | 7% | 3% | 73 a day, more than 1 of the other 4 years | 68 |
| Operations | 4,611 | 15% | 5% | 165 a day, the most in 5 years | 47 |
| Operator, other | 1,437 | 5% | 7% | 51 a day, more than 1 of the other 4 years | 19 |
Period by period
Whose fault, since 2018
- Their own
- 28% (409,089 minutes)
- Network Rail's
- 53% (775,725 minutes)
- Other operators' trains
- 20% (289,676 minutes)
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 2,434 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 2,111 |
| TO | Time lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility) | 1,994 |
| TX | Delays incurred on non-Network Rail running lines or networks including London Underground (except fleet related delays) | 1,815 |
| RB | Passengers joining/alighting | 1,620 |
| IA | Signal failure (including no fault found) | 1,429 |
| M8 | Technical failures above the Solebar | 947 |
| JK | Flooding not due to exceptional weather | 845 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 793 |
| I8 | Animal Strike or Incursion within the control of Network Rail | 780 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 155,352 |
| TX | Delays incurred on non-Network Rail running lines or networks including London Underground (except fleet related delays) | 89,386 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 87,653 |
| RB | Passengers joining/alighting | 67,022 |
| IB | Points failure (including no fault found) | 48,897 |
| MD | Technical failures below the solebar | 43,836 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 38,299 |
| IC | Track circuit failure (including no fault found) | 37,340 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 34,623 |