Leaves on the Line

Merseyrail

CSV JSON

12,739 delay minutes

The biggest share (48%) of the delay picked up by Merseyrail trains in the four weeks to 9 December 2023 came from faulty trains.

57% of these minutes were knock-on from something that happened elsewhere first. 99% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track4764%8% 17 a day, the most in 5 years4
Signals, points and power6225%16% 22 a day, the least in 5 years1
Weather and structures6465%7% 23 a day, more than 3 of the other 4 years39
Autumn8216%7% 29 a day, more than 3 of the other 4 years6
External5524%4% 20 a day, the most in 5 years42
Network management1,25410%17% 45 a day, more than 1 of the other 4 years1,087
The operators' causes
Train faults6,09448%16% 218 a day, the most in 5 years336
Traincrew1,0548%11% 38 a day, the most in 5 years14
Stations96<1%3% 3 a day, more than 1 of the other 4 years-
Operations8477%5% 30 a day, the most in 5 years2
Operator, other2792%7% 10 a day, more than 1 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 100 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

Whose fault, since 2018

Their own
44% (162,301 minutes)
Network Rail's
55% (203,671 minutes)
Other operators' trains
2% (7,090 minutes)

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
MDTechnical failures below the solebar2,036
M7Door and Door system faults1,631
M8Technical failures above the Solebar1,158
TH(Senior) Conductor/Train Manager881
Q3NZ Pumps T753
TOTime lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility)734
XWSevere weather not snow affecting infrastructure the responsibility of Network Rail642
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.473
I9Fires starting on Network Rail Infrastructure329
ZUNo Cause Identified After investigation by both Parties312
Since 2018
CodeWhat Network Rail loggedMinutes
TH(Senior) Conductor/Train Manager37,877
MDTechnical failures below the solebar28,238
TOTime lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility)23,633
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)21,506
ICTrack circuit failure (including no fault found)18,897
ZUNo Cause Identified After investigation by both Parties15,698
M7Door and Door system faults11,499
OHARS / TMS / SARS software problem (excluding scheduling issues and technical failures)10,870
M8Technical failures above the Solebar9,595
TGDriver9,574