Merseyrail
12,739 delay minutes
The biggest share (48%) of the delay picked up by Merseyrail trains in the four weeks to 9 December 2023 came from faulty trains.
57% of these minutes were knock-on from something that happened elsewhere first. 99% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 476 | 4% | 8% | 17 a day, the most in 5 years | 4 |
| Signals, points and power | 622 | 5% | 16% | 22 a day, the least in 5 years | 1 |
| Weather and structures | 646 | 5% | 7% | 23 a day, more than 3 of the other 4 years | 39 |
| Autumn | 821 | 6% | 7% | 29 a day, more than 3 of the other 4 years | 6 |
| External | 552 | 4% | 4% | 20 a day, the most in 5 years | 42 |
| Network management | 1,254 | 10% | 17% | 45 a day, more than 1 of the other 4 years | 1,087 |
| The operators' causes | |||||
| Train faults | 6,094 | 48% | 16% | 218 a day, the most in 5 years | 336 |
| Traincrew | 1,054 | 8% | 11% | 38 a day, the most in 5 years | 14 |
| Stations | 96 | <1% | 3% | 3 a day, more than 1 of the other 4 years | - |
| Operations | 847 | 7% | 5% | 30 a day, the most in 5 years | 2 |
| Operator, other | 279 | 2% | 7% | 10 a day, more than 1 of the other 4 years | - |
Period by period
Whose fault, since 2018
- Their own
- 44% (162,301 minutes)
- Network Rail's
- 55% (203,671 minutes)
- Other operators' trains
- 2% (7,090 minutes)
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| MD | Technical failures below the solebar | 2,036 |
| M7 | Door and Door system faults | 1,631 |
| M8 | Technical failures above the Solebar | 1,158 |
| TH | (Senior) Conductor/Train Manager | 881 |
| Q3 | NZ Pumps T | 753 |
| TO | Time lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility) | 734 |
| XW | Severe weather not snow affecting infrastructure the responsibility of Network Rail | 642 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 473 |
| I9 | Fires starting on Network Rail Infrastructure | 329 |
| ZU | No Cause Identified After investigation by both Parties | 312 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TH | (Senior) Conductor/Train Manager | 37,877 |
| MD | Technical failures below the solebar | 28,238 |
| TO | Time lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility) | 23,633 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 21,506 |
| IC | Track circuit failure (including no fault found) | 18,897 |
| ZU | No Cause Identified After investigation by both Parties | 15,698 |
| M7 | Door and Door system faults | 11,499 |
| OH | ARS / TMS / SARS software problem (excluding scheduling issues and technical failures) | 10,870 |
| M8 | Technical failures above the Solebar | 9,595 |
| TG | Driver | 9,574 |