Northern
265,680 delay minutes
The biggest share (15%) of the delay picked up by Northern trains in the four weeks to 9 December 2023 came from faulty trains.
65% of these minutes were knock-on from something that happened elsewhere first. 87% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 13,834 | 5% | 8% | 494 a day, more than 2 of the other 4 years | 110 |
| Signals, points and power | 29,922 | 11% | 16% | 1,069 a day, more than 2 of the other 4 years | 258 |
| Weather and structures | 24,730 | 9% | 7% | 883 a day, the most in 5 years | 401 |
| Autumn | 29,580 | 11% | 7% | 1,056 a day, more than 2 of the other 4 years | 24 |
| External | 14,624 | 6% | 4% | 522 a day, the most in 5 years | 167 |
| Network management | 38,422 | 14% | 17% | 1,372 a day, more than 3 of the other 4 years | 2,275 |
| The operators' causes | |||||
| Train faults | 38,583 | 15% | 16% | 1,378 a day, more than 2 of the other 4 years | 653 |
| Traincrew | 30,770 | 12% | 11% | 1,099 a day, more than 3 of the other 4 years | 2,846 |
| Stations | 8,095 | 3% | 3% | 289 a day, more than 2 of the other 4 years | 23 |
| Operations | 13,979 | 5% | 5% | 499 a day, more than 3 of the other 4 years | 157 |
| Operator, other | 23,143 | 9% | 7% | 827 a day, more than 2 of the other 4 years | 86 |
Period by period
Whose fault, since 2018
- Their own
- 41% (3,941,855 minutes)
- Network Rail's
- 46% (4,462,532 minutes)
- Other operators' trains
- 13% (1,206,114 minutes)
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 18,215 |
| Q3 | NZ Pumps T | 16,499 |
| OU | Delays not Investigated by Network Rail | 14,638 |
| TT | Leaf fall Neutral | 14,612 |
| XW | Severe weather not snow affecting infrastructure the responsibility of Network Rail | 11,865 |
| TH | (Senior) Conductor/Train Manager | 9,825 |
| QJ | Special working for leaf-fall track circuit operation | 9,355 |
| MD | Technical failures below the solebar | 8,361 |
| XO | External trees, building or structures encroaching or falling onto network infrastructure (not weather or vandalism) | 6,682 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 5,952 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 806,206 |
| MD | Technical failures below the solebar | 589,297 |
| MS | Planned underpowered or shortformed service and or vehicle, incl. exam set swaps | 328,425 |
| TH | (Senior) Conductor/Train Manager | 264,370 |
| M8 | Technical failures above the Solebar | 257,847 |
| M7 | Door and Door system faults | 250,157 |
| IB | Points failure (including no fault found) | 247,195 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 224,108 |
| Q3 | NZ Pumps T | 210,392 |
| IC | Track circuit failure (including no fault found) | 208,658 |