82,823 delay minutes

The biggest share (16%) of the delay picked up by ScotRail trains in the four weeks to 9 December 2023 came from weather and structures.

66% of these minutes were knock-on from something that happened elsewhere first. 95% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track3,1794%8% 114 a day, more than 1 of the other 4 years32
Signals, points and power9,29111%16% 332 a day, more than 1 of the other 4 years215
Weather and structures13,43916%7% 480 a day, more than 3 of the other 4 years187
Autumn8,22910%7% 294 a day, more than 2 of the other 4 years4
External2,3763%4% 85 a day, more than 1 of the other 4 years46
Network management12,50215%17% 446 a day, more than 2 of the other 4 years1,876
The operators' causes
Train faults12,53615%16% 448 a day, more than 2 of the other 4 years388
Traincrew6,7938%11% 243 a day, more than 1 of the other 4 years160
Stations2,1963%3% 78 a day, more than 1 of the other 4 years2
Operations3,3734%5% 120 a day, more than 2 of the other 4 years24
Operator, other8,91211%7% 318 a day, more than 2 of the other 4 years70

Period by period

Delay minutes a day, period by period. Gridlines every 1,000 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

Whose fault, since 2018

Their own
34% (1,520,747 minutes)
Network Rail's
58% (2,593,043 minutes)
Other operators' trains
7% (326,871 minutes)

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
Q3NZ Pumps T6,563
X4Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions5,793
TGDriver5,599
MPRail / wheel interface, adhesion problems (including ice on the running rail)5,292
M8Technical failures above the Solebar3,268
X9Points failure caused by severe snow or ice where heaters are fitted and working as designed2,703
TOTime lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility)2,361
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure2,210
MDTechnical failures below the solebar2,107
ZUNo Cause Identified After investigation by both Parties2,037
Since 2018
CodeWhat Network Rail loggedMinutes
TGDriver338,737
TOTime lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility)273,151
X4Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions222,528
M8Technical failures above the Solebar184,203
ZUNo Cause Identified After investigation by both Parties181,616
MDTechnical failures below the solebar176,552
IBPoints failure (including no fault found)147,732
X2Severe flooding beyond that which could be mitigated on Network Rail infrastructure120,925
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.111,750
Q3NZ Pumps T105,667