ScotRail
82,823 delay minutes
The biggest share (16%) of the delay picked up by ScotRail trains in the four weeks to 9 December 2023 came from weather and structures.
66% of these minutes were knock-on from something that happened elsewhere first. 95% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 3,179 | 4% | 8% | 114 a day, more than 1 of the other 4 years | 32 |
| Signals, points and power | 9,291 | 11% | 16% | 332 a day, more than 1 of the other 4 years | 215 |
| Weather and structures | 13,439 | 16% | 7% | 480 a day, more than 3 of the other 4 years | 187 |
| Autumn | 8,229 | 10% | 7% | 294 a day, more than 2 of the other 4 years | 4 |
| External | 2,376 | 3% | 4% | 85 a day, more than 1 of the other 4 years | 46 |
| Network management | 12,502 | 15% | 17% | 446 a day, more than 2 of the other 4 years | 1,876 |
| The operators' causes | |||||
| Train faults | 12,536 | 15% | 16% | 448 a day, more than 2 of the other 4 years | 388 |
| Traincrew | 6,793 | 8% | 11% | 243 a day, more than 1 of the other 4 years | 160 |
| Stations | 2,196 | 3% | 3% | 78 a day, more than 1 of the other 4 years | 2 |
| Operations | 3,373 | 4% | 5% | 120 a day, more than 2 of the other 4 years | 24 |
| Operator, other | 8,912 | 11% | 7% | 318 a day, more than 2 of the other 4 years | 70 |
Period by period
Whose fault, since 2018
- Their own
- 34% (1,520,747 minutes)
- Network Rail's
- 58% (2,593,043 minutes)
- Other operators' trains
- 7% (326,871 minutes)
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| Q3 | NZ Pumps T | 6,563 |
| X4 | Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions | 5,793 |
| TG | Driver | 5,599 |
| MP | Rail / wheel interface, adhesion problems (including ice on the running rail) | 5,292 |
| M8 | Technical failures above the Solebar | 3,268 |
| X9 | Points failure caused by severe snow or ice where heaters are fitted and working as designed | 2,703 |
| TO | Time lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility) | 2,361 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 2,210 |
| MD | Technical failures below the solebar | 2,107 |
| ZU | No Cause Identified After investigation by both Parties | 2,037 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 338,737 |
| TO | Time lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility) | 273,151 |
| X4 | Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions | 222,528 |
| M8 | Technical failures above the Solebar | 184,203 |
| ZU | No Cause Identified After investigation by both Parties | 181,616 |
| MD | Technical failures below the solebar | 176,552 |
| IB | Points failure (including no fault found) | 147,732 |
| X2 | Severe flooding beyond that which could be mitigated on Network Rail infrastructure | 120,925 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 111,750 |
| Q3 | NZ Pumps T | 105,667 |