122,351 delay minutes

The biggest share (24%) of the delay picked up by South Western Railway trains in the four weeks to 9 December 2023 came from signal, points and power faults.

70% of these minutes were knock-on from something that happened elsewhere first. 99% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track11,1349%8% 398 a day, more than 2 of the other 4 years165
Signals, points and power28,99824%16% 1,036 a day, more than 3 of the other 4 years257
Weather and structures5,3674%7% 192 a day, more than 2 of the other 4 years213
Autumn10,3688%7% 370 a day, more than 3 of the other 4 years6
External2,7102%4% 97 a day, more than 1 of the other 4 years23
Network management23,40519%17% 836 a day, more than 2 of the other 4 years608
The operators' causes
Train faults13,64611%16% 487 a day, more than 2 of the other 4 years306
Traincrew9,4728%11% 338 a day, more than 3 of the other 4 years671
Stations4,1303%3% 148 a day, more than 1 of the other 4 years3
Operations2,4042%5% 86 a day, the most in 5 years218
Operator, other10,7199%7% 383 a day, more than 2 of the other 4 years47

Period by period

Delay minutes a day, period by period. Gridlines every 2,000 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

Whose fault, since 2018

Their own
26% (1,314,116 minutes)
Network Rail's
69% (3,455,040 minutes)
Other operators' trains
4% (223,070 minutes)

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
IBPoints failure (including no fault found)12,853
Q3NZ Pumps T7,325
TTLeaf fall Neutral7,318
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.6,258
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)6,036
TGDriver5,573
MDTechnical failures below the solebar4,784
IRBroken/cracked/twisted/buckled/flawed rail4,499
ICTrack circuit failure (including no fault found)4,469
JDStructures - Bridges/tunnels/buildings/retaining walls/sea defences (not bridge strikes)3,836
Since 2018
CodeWhat Network Rail loggedMinutes
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.389,355
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)330,161
ICTrack circuit failure (including no fault found)285,492
TGDriver232,128
MDTechnical failures below the solebar186,711
IBPoints failure (including no fault found)183,393
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure177,110
IRBroken/cracked/twisted/buckled/flawed rail132,177
OCSignaller including mis-routing (not ERTM /ETCS related)123,360
TH(Senior) Conductor/Train Manager115,383