87,364 delay minutes

The biggest share (20%) of the delay picked up by Southeastern trains in the four weeks to 9 December 2023 came from other operator causes.

73% of these minutes were knock-on from something that happened elsewhere first. 97% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track3,7474%8% 134 a day, more than 1 of the other 4 years22
Signals, points and power8,0949%16% 289 a day, the least in 5 years73
Weather and structures3,1814%7% 114 a day, more than 3 of the other 4 years32
Autumn12,71915%7% 454 a day, the most in 5 years22
External1,4792%4% 53 a day, the least in 5 years34
Network management16,36819%17% 585 a day, more than 1 of the other 4 years720
The operators' causes
Train faults14,43817%16% 516 a day, more than 3 of the other 4 years267
Traincrew5,4466%11% 195 a day, more than 3 of the other 4 years79
Stations1,4252%3% 51 a day, more than 2 of the other 4 years4
Operations2,6583%5% 95 a day, the most in 5 years22
Operator, other17,81020%7% 636 a day, more than 2 of the other 4 years46

Period by period

Delay minutes a day, period by period. Gridlines every 1,000 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

Whose fault, since 2018

Their own
29% (1,286,132 minutes)
Network Rail's
67% (3,018,389 minutes)
Other operators' trains
4% (194,970 minutes)

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
Q3NZ Pumps T11,029
TTLeaf fall Neutral10,583
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)5,661
VHPassenger Communication cord, door egress or emergency train alarm operated5,174
MNBrake and brake systems faults; including wheel flats where no other cause had been identified5,039
TGDriver4,125
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.3,089
OGIce on conductor rail/OHLE3,056
OCSignaller including mis-routing (not ERTM /ETCS related)2,799
ICTrack circuit failure (including no fault found)2,364
Since 2018
CodeWhat Network Rail loggedMinutes
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)428,457
TGDriver227,979
ICTrack circuit failure (including no fault found)216,737
IBPoints failure (including no fault found)188,615
VHPassenger Communication cord, door egress or emergency train alarm operated155,627
OCSignaller including mis-routing (not ERTM /ETCS related)143,335
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.136,496
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure130,093
IRBroken/cracked/twisted/buckled/flawed rail125,582
TTLeaf fall Neutral102,173