Leaves on the Line

TransPennine Express

CSV JSON

70,349 delay minutes

The biggest share (17%) of the delay picked up by TransPennine Express trains in the four weeks to 9 December 2023 came from faulty trains.

71% of these minutes were knock-on from something that happened elsewhere first. 91% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track6,6079%8% 236 a day, more than 3 of the other 4 years47
Signals, points and power7,41811%16% 265 a day, more than 2 of the other 4 years16
Weather and structures6,2899%7% 225 a day, the most in 5 years48
Autumn5,8178%7% 208 a day, the most in 5 years4
External2,5764%4% 92 a day, the most in 5 years10
Network management10,51315%17% 375 a day, more than 3 of the other 4 years807
The operators' causes
Train faults12,22817%16% 437 a day, more than 2 of the other 4 years151
Traincrew10,69715%11% 382 a day, more than 3 of the other 4 years138
Stations2,0693%3% 74 a day, more than 2 of the other 4 years-
Operations2,8994%5% 104 a day, more than 3 of the other 4 years23
Operator, other3,2385%7% 116 a day, more than 2 of the other 4 years12

Period by period

Delay minutes a day, period by period. Gridlines every 1,000 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

Whose fault, since 2018

Their own
24% (627,187 minutes)
Network Rail's
50% (1,315,950 minutes)
Other operators' trains
26% (675,197 minutes)

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
TGDriver6,127
OUDelays not Investigated by Network Rail3,595
TH(Senior) Conductor/Train Manager3,551
IRBroken/cracked/twisted/buckled/flawed rail3,435
QJSpecial working for leaf-fall track circuit operation3,054
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.2,957
MDTechnical failures below the solebar2,321
XWSevere weather not snow affecting infrastructure the responsibility of Network Rail2,087
Q3NZ Pumps T1,861
M8Technical failures above the Solebar1,793
Since 2018
CodeWhat Network Rail loggedMinutes
TGDriver265,858
MDTechnical failures below the solebar125,668
M8Technical failures above the Solebar90,996
TH(Senior) Conductor/Train Manager88,035
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.76,577
IBPoints failure (including no fault found)70,892
M7Door and Door system faults67,365
ICTrack circuit failure (including no fault found)64,656
MUDepot operating problem61,684
MNBrake and brake systems faults; including wheel flats where no other cause had been identified61,218