West Midlands Trains
84,077 delay minutes
The biggest share (23%) of the delay picked up by West Midlands Trains trains in the four weeks to 9 December 2023 came from signal, points and power faults.
67% of these minutes were knock-on from something that happened elsewhere first. 94% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 4,051 | 5% | 8% | 145 a day, more than 1 of the other 4 years | 12 |
| Signals, points and power | 18,961 | 23% | 16% | 677 a day, the most in 5 years | 229 |
| Weather and structures | 1,904 | 2% | 7% | 68 a day, the least in 5 years | 7 |
| Autumn | 4,487 | 5% | 7% | 160 a day, the most in 5 years | 24 |
| External | 3,007 | 4% | 4% | 107 a day, more than 2 of the other 4 years | 48 |
| Network management | 12,238 | 15% | 17% | 437 a day, the least in 5 years | 629 |
| The operators' causes | |||||
| Train faults | 13,883 | 17% | 16% | 496 a day, more than 3 of the other 4 years | 273 |
| Traincrew | 13,510 | 16% | 11% | 482 a day, more than 2 of the other 4 years | 719 |
| Stations | 4,073 | 5% | 3% | 145 a day, more than 1 of the other 4 years | 3 |
| Operations | 1,731 | 2% | 5% | 62 a day, more than 1 of the other 4 years | 40 |
| Operator, other | 6,233 | 7% | 7% | 223 a day, more than 1 of the other 4 years | 52 |
Period by period
Whose fault, since 2018
- Their own
- 32% (1,291,603 minutes)
- Network Rail's
- 54% (2,224,721 minutes)
- Other operators' trains
- 14% (578,225 minutes)
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 10,442 |
| IB | Points failure (including no fault found) | 6,795 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 3,297 |
| M8 | Technical failures above the Solebar | 2,847 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 2,822 |
| IH | Power Supply And Distribution System Failure | 2,599 |
| JP | Failure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards | 2,535 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 2,507 |
| MD | Technical failures below the solebar | 2,388 |
| Q3 | NZ Pumps T | 2,331 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 426,390 |
| TH | (Senior) Conductor/Train Manager | 175,034 |
| IB | Points failure (including no fault found) | 158,420 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 151,971 |
| MD | Technical failures below the solebar | 149,628 |
| M8 | Technical failures above the Solebar | 123,298 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 108,348 |
| I1 | Overhead line/third rail defect | 103,953 |
| ZU | No Cause Identified After investigation by both Parties | 102,326 |
| J3 | Axle Counter Failure | 96,081 |