Chiltern route
2,989 delay minutes
Most of the delay picked up on the Chiltern route in the four weeks to 9 December 2023 came from the operators' own operations.
4% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 44 | 1% | 8% | 2 a day, more than 3 of the other 4 years | - |
| Signals, points and power | 17 | <1% | 16% | 1 a day, the least in 5 years | - |
| Weather and structures | - | - | 7% | 0 a day, the least in 5 years | - |
| Autumn | 265 | 9% | 7% | 9 a day, more than 3 of the other 4 years | 2 |
| External | 19 | <1% | 4% | 1 a day, more than 3 of the other 4 years | - |
| Network management | 60 | 2% | 17% | 2 a day, the least in 5 years | - |
| The operators' causes | |||||
| Train faults | 127 | 4% | 16% | 5 a day, more than 1 of the other 4 years | 2 |
| Traincrew | 99 | 3% | 11% | 4 a day, more than 3 of the other 4 years | - |
| Stations | 7 | <1% | 3% | 0 a day, the least in 5 years | - |
| Operations | 2,313 | 77% | 5% | 83 a day, more than 3 of the other 4 years | - |
| Operator, other | 38 | 1% | 7% | 1 a day, more than 1 of the other 4 years | - |
Period by period
Worst stretches since 2018
Where the incidents started, by cause, counting all the knock-on delay they caused anywhere.
| Harrow-on-the-Hill to Neasden South Jn | 168 |
| Amersham to Aylesbury | 100 |
| Amersham to Harrow-on-the-Hill | 15 |
| Harrow-on-the-Hill to Amersham | 5 |
| Amersham to Aylesbury | 1,724 |
| Harrow-on-the-Hill to Neasden South Jn | 791 |
| Amersham | 213 |
| Harrow-on-the-Hill to Amersham | 158 |
| Amersham to Aylesbury | 220 |
| Harrow-on-the-Hill to Amersham | 4 |
| Harrow-on-the-Hill to Neasden South Jn | 3 |
| Amersham to Aylesbury | 964 |
| Amersham to Harrow-on-the-Hill | 92 |
| Harrow-on-the-Hill to Amersham | 51 |
| Amersham to Aylesbury | 531 |
| Harrow-on-the-Hill to Neasden South Jn | 12 |
| Harrow-on-the-Hill to Amersham | 10 |
| Amersham | 5 |
| Harrow-on-the-Hill | 5 |
| Amersham to Harrow-on-the-Hill | 1,193 |
| Amersham to Aylesbury | 632 |
| Harrow-on-the-Hill to Amersham | 521 |
| Harrow-on-the-Hill to Neasden South Jn | 351 |
| Amersham | 103 |
| Harrow-on-the-Hill | 89 |
| Harrow-on-the-Hill to Amersham | 1,565 |
| Amersham to Aylesbury | 932 |
| Amersham to Harrow-on-the-Hill | 727 |
| Harrow-on-the-Hill | 300 |
| Amersham | 132 |
| Harrow-on-the-Hill to Neasden South Jn | 27 |
| Rickmansworth | 7 |
| Harrow-on-the-Hill to Amersham | 1,476 |
| Amersham to Harrow-on-the-Hill | 697 |
| Amersham to Aylesbury | 263 |
| Amersham | 53 |
| Harrow-on-the-Hill | 32 |
| Harrow-on-the-Hill to Neasden South Jn | 9 |
| Amersham to Great Missenden | 4 |
| Harrow-on-the-Hill to Amersham | 1,077 |
| Amersham to Harrow-on-the-Hill | 601 |
| Amersham to Aylesbury | 98 |
| Amersham | 16 |
| Harrow-on-the-Hill | 8 |
| Harrow-on-the-Hill to Neasden South Jn | 5 |
| Harrow-on-the-Hill to Amersham | 60,794 |
| Amersham to Harrow-on-the-Hill | 37,568 |
| Amersham | 2,133 |
| Harrow-on-the-Hill | 609 |
| Amersham to Aylesbury | 485 |
| Harrow-on-the-Hill to Neasden South Jn | 98 |
| Amersham to Harrow-on-the-Hill | 3,064 |
| Harrow-on-the-Hill to Amersham | 2,102 |
| Harrow-on-the-Hill | 292 |
| Amersham to Aylesbury | 212 |
| Amersham | 134 |
| Harrow-on-the-Hill to Neasden South Jn | 7 |
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TX | Delays incurred on non-Network Rail running lines or networks including London Underground (except fleet related delays) | 2,300 |
| QJ | Special working for leaf-fall track circuit operation | 199 |
| TG | Driver | 94 |
| M7 | Door and Door system faults | 47 |
| OS | Late start or delays to Railhead Conditioning or Ghost Train due to its own activity and not in reaction to another incident | 41 |
| MD | Technical failures below the solebar | 30 |
| OE | Failure to lay Sandite or operate Railhead Conditioning train as programmed | 30 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 24 |
| QI | Cautioning due to railhead leaf contamination | 24 |
| JS | Condition of Track TSR outside the Timetable Planning Rules | 20 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TX | Delays incurred on non-Network Rail running lines or networks including London Underground (except fleet related delays) | 85,606 |
| VX | External events occurring on the LUL or other non NR running lines | 3,173 |
| TG | Driver | 3,006 |
| MD | Technical failures below the solebar | 2,642 |
| IC | Track circuit failure (including no fault found) | 2,079 |
| RB | Passengers joining/alighting | 1,757 |
| M7 | Door and Door system faults | 1,215 |
| M8 | Technical failures above the Solebar | 980 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 857 |
| IB | Points failure (including no fault found) | 828 |