Scotland route
97,148 delay minutes
The biggest share (18%) of the delay picked up on the Scotland route in the four weeks to 9 December 2023 came from faulty trains.
66% of these minutes were knock-on from something that happened elsewhere first. 94% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 3,885 | 4% | 8% | 139 a day, more than 1 of the other 4 years | 33 |
| Signals, points and power | 11,017 | 11% | 16% | 393 a day, more than 1 of the other 4 years | 224 |
| Weather and structures | 16,027 | 16% | 7% | 572 a day, more than 3 of the other 4 years | 206 |
| Autumn | 8,579 | 9% | 7% | 306 a day, more than 2 of the other 4 years | 4 |
| External | 2,569 | 3% | 4% | 92 a day, more than 1 of the other 4 years | 49 |
| Network management | 14,007 | 14% | 17% | 500 a day, more than 2 of the other 4 years | 2,272 |
| The operators' causes | |||||
| Train faults | 17,682 | 18% | 16% | 631 a day, more than 2 of the other 4 years | 451 |
| Traincrew | 7,809 | 8% | 11% | 279 a day, more than 1 of the other 4 years | 228 |
| Stations | 2,440 | 3% | 3% | 87 a day, more than 1 of the other 4 years | 2 |
| Operations | 3,861 | 4% | 5% | 138 a day, more than 2 of the other 4 years | 32 |
| Operator, other | 9,275 | 10% | 7% | 331 a day, more than 2 of the other 4 years | 71 |
Period by period
Worst stretches since 2018
Where the incidents started, by cause, counting all the knock-on delay they caused anywhere.
| Dalmuir to Garscadden | 16,690 |
| Rutherglen East Jn to Newton West Jn | 6,689 |
| Glasgow Central to Rutherglen East Jn | 6,175 |
| Lenzie to Glasgow Queen Street | 6,066 |
| Carstairs to Carstairs South Jn | 5,946 |
| Lockerbie to Beattock Summit | 5,646 |
| Haymarket West Jn to Newbridge Jn | 5,219 |
| Motherwell to Newton West Jn | 5,147 |
| Corkerhill C.S.M.D. to Paisley Canal | 4,649 |
| Carstairs South Jn to Beattock Summit | 4,034 |
| Glasgow Central | 16,573 |
| Beattock Summit to Lockerbie | 12,198 |
| Haymarket to Edinburgh | 11,298 |
| Carstairs South Jn to Beattock Summit | 11,191 |
| Lockerbie to Gretna Jn | 10,858 |
| Haymarket to Midcalder Jn | 10,148 |
| Edinburgh | 9,718 |
| Haymarket | 9,700 |
| Newbridge Jn | 9,016 |
| Perth to Blackford | 7,600 |
| Edinburgh | 29,940 |
| Lenzie to Greenhill Upper Jn | 21,865 |
| Crianlarich to Taynuilt | 20,377 |
| Glasgow Central | 16,405 |
| Lockerbie to Beattock Summit | 14,816 |
| Garelochhead to Crianlarich | 13,692 |
| Grantshouse to Reston Signal Eg402 | 13,032 |
| Carstairs South Jn to Beattock Summit | 12,533 |
| Law Jn to Carstairs | 10,919 |
| Montrose to Laurencekirk | 10,493 |
| Garscadden to Dalmuir | 5,106 |
| Kirkcaldy to Inverkeithing | 4,573 |
| Glasgow Central Low Level to Hyndland | 4,098 |
| Inverkeithing to Kirkcaldy | 3,592 |
| Midcalder Jn to Shotts | 3,562 |
| Newton (S Lanarks) to Hamilton Central | 3,449 |
| Dalmuir | 3,409 |
| Hamilton Central to Newton (S Lanarks) | 3,061 |
| Pitlochry to Dalwhinnie | 3,042 |
| Dalmuir to Dumbarton Central | 2,949 |
| Carstairs South Jn to Beattock Summit | 9,751 |
| Grantshouse to Dunbar | 5,745 |
| Edinburgh | 4,808 |
| Glasgow Central to Rutherglen East Jn | 4,616 |
| Monktonhall Jn to Edinburgh | 4,254 |
| Edinburgh to Craiglockhart Jn | 4,122 |
| Carstairs East Jn to Midcalder Jn | 3,964 |
| Kilmarnock to Barrhead | 3,637 |
| Dalwhinnie to Pitlochry | 3,074 |
| Usan to Carnoustie | 2,644 |
| Glasgow Central | 68,260 |
| Edinburgh | 25,574 |
| Dalmuir | 17,859 |
| Ladybank to Dundee | 15,264 |
| Carstairs South Jn to Beattock Summit | 13,910 |
| Inverness to Aviemore | 11,989 |
| Kilmarnock to Barrhead | 11,885 |
| Dundee to Carnoustie | 11,529 |
| Dundee to Ladybank | 10,098 |
| Glasgow Queen Street | 9,020 |
| Edinburgh | 83,947 |
| Glasgow Central | 50,651 |
| Glasgow Queen Street | 31,033 |
| Craigentinny T.&R.S.M.D | 27,440 |
| Aberdeen | 24,243 |
| Lockerbie to Beattock Summit | 21,290 |
| Inverness | 17,899 |
| Haymarket | 15,742 |
| Edinburgh to Haymarket West Jn | 13,576 |
| Perth | 11,448 |
| Edinburgh | 56,344 |
| Glasgow Central | 53,290 |
| Perth | 12,520 |
| Glasgow Queen Street | 11,634 |
| Edinburgh to Haymarket West Jn | 9,936 |
| Aberdeen | 9,364 |
| Dalmuir | 8,917 |
| Motherwell | 8,628 |
| Inverness | 8,458 |
| Craigentinny T.&R.S.M.D | 7,085 |
| Edinburgh | 15,893 |
| Glasgow Central | 8,224 |
| Haymarket | 6,500 |
| Edinburgh to Haymarket West Jn | 5,899 |
| Motherwell | 4,588 |
| Kirkcaldy to Inverkeithing | 4,580 |
| Fushiebridge Jn to Newcraighall | 4,533 |
| Dundee | 4,141 |
| Perth | 4,136 |
| Dundee to Ladybank | 2,912 |
| Edinburgh | 20,550 |
| Glasgow Central Low Level to Hyndland | 12,056 |
| Kirkcaldy to Inverkeithing | 10,843 |
| Inverkeithing to Kirkcaldy | 9,077 |
| Fushiebridge Jn to Newcraighall | 7,362 |
| Glasgow Central | 7,346 |
| Newbridge Jn to Haymarket West Jn | 7,124 |
| Haymarket to Midcalder Jn | 6,404 |
| Midcalder Jn to Shotts | 5,979 |
| Greenhill Upper Jn to Lenzie | 5,261 |
| Mossend Down Yard | 6,940 |
| Mossend Euroterminal | 6,695 |
| Kirkcaldy to Inverkeithing | 4,696 |
| Glasgow Central | 4,336 |
| Inverkeithing to Kirkcaldy | 3,902 |
| Glasgow Central Low Level to Hyndland | 3,869 |
| Hyndland | 3,834 |
| Inverness to Aviemore | 3,453 |
| Midcalder Jn to Shotts | 3,047 |
| Dalmuir to Dumbarton Central | 3,001 |
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| Q3 | NZ Pumps T | 6,801 |
| X4 | Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions | 6,550 |
| TG | Driver | 6,335 |
| MP | Rail / wheel interface, adhesion problems (including ice on the running rail) | 5,467 |
| M8 | Technical failures above the Solebar | 3,611 |
| X9 | Points failure caused by severe snow or ice where heaters are fitted and working as designed | 2,868 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 2,520 |
| TO | Time lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility) | 2,502 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 2,420 |
| M1 | Confirmed Pantograph ADD, associated system faults, positive PANCHEX activations and train borne power switch over systems (AC) | 2,351 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 379,505 |
| TO | Time lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility) | 286,891 |
| X4 | Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions | 265,669 |
| M8 | Technical failures above the Solebar | 206,587 |
| MD | Technical failures below the solebar | 199,915 |
| ZU | No Cause Identified After investigation by both Parties | 191,041 |
| IB | Points failure (including no fault found) | 169,209 |
| X2 | Severe flooding beyond that which could be mitigated on Network Rail infrastructure | 138,873 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 130,693 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 113,517 |