95,757 delay minutes
The biggest share (28%) of the delay picked up on the Wales route in the four weeks to 9 December 2023 came from faulty trains.
64% of these minutes were knock-on from something that happened elsewhere first. 90% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 2,989 | 3% | 8% | 107 a day, more than 3 of the other 4 years | 30 |
| Signals, points and power | 14,053 | 15% | 16% | 502 a day, the most in 5 years | 120 |
| Weather and structures | 1,984 | 2% | 7% | 71 a day, the least in 5 years | 59 |
| Autumn | 5,892 | 6% | 7% | 210 a day, the most in 5 years | 19 |
| External | 2,161 | 2% | 4% | 77 a day, more than 2 of the other 4 years | 15 |
| Network management | 11,705 | 12% | 17% | 418 a day, more than 2 of the other 4 years | 1,881 |
| The operators' causes | |||||
| Train faults | 26,462 | 28% | 16% | 945 a day, the most in 5 years | 484 |
| Traincrew | 14,313 | 15% | 11% | 511 a day, the most in 5 years | 210 |
| Stations | 5,822 | 6% | 3% | 208 a day, the most in 5 years | 11 |
| Operations | 6,605 | 7% | 5% | 236 a day, the most in 5 years | 81 |
| Operator, other | 3,773 | 4% | 7% | 135 a day, the most in 5 years | 26 |
Period by period
Worst stretches since 2018
Where the incidents started, by cause, counting all the knock-on delay they caused anywhere.
| Severn Tunnel Junction to Pilning | 15,020 |
| Llanelli to Carmarthen Jn | 4,488 |
| Pontyclun to Cardiff Central | 4,437 |
| Dovey Junction to Aberystwyth | 4,172 |
| Whitland to Carmarthen | 3,806 |
| Pilning to Severn Tunnel Junction | 3,550 |
| Whitland to Carmarthen Jn | 3,243 |
| Holyhead to Bangor (Gwynedd) | 3,077 |
| Llandudno Junction to Rhyl | 3,033 |
| Cardiff Central to Pontyclun | 2,672 |
| Cardiff Central | 46,860 |
| Wem to Nantwich | 19,088 |
| Severn Tunnel Junction | 14,427 |
| Sutton Bridge Jn to Welshpool | 12,317 |
| Shrewsbury | 10,121 |
| Rhyl | 9,283 |
| Marshfield to Newport (S Wales) | 9,061 |
| Bangor (Gwynedd) | 8,132 |
| Llandudno Junction | 7,394 |
| Cardiff Central to Pontyclun | 6,745 |
| Lydney to Awre | 32,695 |
| Cardiff Central to Pontyclun | 11,131 |
| Cardiff Central | 10,842 |
| Bangor (Gwynedd) to Holyhead | 10,387 |
| Machynlleth to Talerddig | 9,108 |
| Dovey Junction to Aberystwyth | 8,268 |
| Swansea | 7,443 |
| Swansea to Neath | 7,403 |
| Pontyclun to Cardiff Central | 7,047 |
| Pontyclun to Bridgend | 6,282 |
| Wrexham General to Dee Marsh Jn. | 2,357 |
| Dee Marsh Jn. to Wrexham General | 2,174 |
| Wrexham General to Gobowen | 1,765 |
| Nantwich to Wem | 1,440 |
| Llandudno Junction to Bangor (Gwynedd) | 1,408 |
| Llanelli to Swansea Loop West | 1,303 |
| Gobowen to Wrexham General | 1,162 |
| Bangor (Gwynedd) to Llandudno Junction | 1,080 |
| Machynlleth to Talerddig | 1,060 |
| Maindee North Jn to Abergavenny | 904 |
| Newport (S Wales) to Marshfield | 17,979 |
| Cardiff Central | 11,947 |
| Newport (S Wales) | 6,630 |
| Cardiff Central to Pontyclun | 3,721 |
| Bridgend to Pontyclun | 3,613 |
| Holyhead to Bangor (Gwynedd) | 2,975 |
| Rhyl to Shotton | 2,452 |
| Wrexham General | 2,447 |
| Shrewsbury | 2,425 |
| Pontyclun to Cardiff Central | 2,363 |
| Cardiff Central | 229,735 |
| Pontyclun to Bridgend | 35,782 |
| Bridgend to Pontyclun | 26,827 |
| Shrewsbury | 22,120 |
| Marshfield to Cardiff Central | 14,119 |
| Port Talbot Parkway to Bridgend | 10,940 |
| Bangor (Gwynedd) to Holyhead | 9,111 |
| Knighton to Llandrindod | 9,066 |
| Cardiff Central to Pontyclun | 9,017 |
| Pontyclun to Cardiff Central | 8,431 |
| Cardiff Central | 223,536 |
| Cardiff Canton Sidings | 99,244 |
| Shrewsbury | 80,986 |
| Swansea | 34,026 |
| Machynlleth | 26,046 |
| Carmarthen | 21,689 |
| Bridgend | 14,465 |
| Newport (S Wales) | 13,716 |
| Holyhead | 12,700 |
| Hereford | 11,364 |
| Cardiff Central | 99,940 |
| Cardiff Canton Sidings | 37,743 |
| Shrewsbury | 35,515 |
| Carmarthen | 22,690 |
| Swansea | 18,138 |
| Holyhead | 7,812 |
| Machynlleth | 7,192 |
| Llandudno Junction | 6,816 |
| Ebbw Vale Town to Park Jn | 5,866 |
| Newport (S Wales) | 4,197 |
| Cardiff Central | 26,851 |
| Llandudno Junction to Rhyl | 8,927 |
| Ebbw Vale Town to Park Jn | 6,864 |
| Newport (S Wales) | 6,764 |
| Grangetown (Cardiff) to Dinas Powys | 5,954 |
| Llandudno Junction to Bangor (Gwynedd) | 5,374 |
| Carmarthen Jn to Llanelli | 5,366 |
| Dee Marsh Jn. to Wrexham General | 4,886 |
| Wrexham General to Dee Marsh Jn. | 4,770 |
| Rhyl | 4,556 |
| Cardiff Central | 41,083 |
| Cardiff Canton Sidings | 18,648 |
| Shrewsbury | 12,615 |
| Swansea | 6,536 |
| Carmarthen | 5,363 |
| Machynlleth | 3,240 |
| Wentloog (Freightliners) | 2,954 |
| Llandudno Junction | 2,706 |
| Wrexham General | 2,639 |
| Holyhead | 2,551 |
| Margam T.C. | 11,385 |
| Cardiff Central | 6,981 |
| Wentloog (Freightliners) | 6,237 |
| Shrewsbury | 2,254 |
| Wrexham General to Dee Marsh Jn. | 2,192 |
| Llanwern Exchange Sdgs | 1,667 |
| Wrexham General to Gobowen | 1,644 |
| Bridgend | 1,501 |
| Dee Marsh Jn. to Wrexham General | 1,499 |
| Newport (Swales) East Uskyard (Fhh) | 1,374 |
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| MS | Planned underpowered or shortformed service and or vehicle, incl. exam set swaps | 9,081 |
| TG | Driver | 8,396 |
| TZ | Other Passenger Train Operating Company causes | 4,807 |
| M8 | Technical failures above the Solebar | 4,790 |
| T2 | Delay at unstaffed station to non-DOO train | 4,620 |
| TH | (Senior) Conductor/Train Manager | 3,123 |
| M7 | Door and Door system faults | 2,959 |
| OT | Ops Safety TSR implemented for sighting issues relating to foot crossings, level crossings or signals (Not vegetation caused) | 2,680 |
| QI | Cautioning due to railhead leaf contamination | 2,547 |
| TT | Leaf fall Neutral | 2,425 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| MS | Planned underpowered or shortformed service and or vehicle, incl. exam set swaps | 225,797 |
| TG | Driver | 206,262 |
| MD | Technical failures below the solebar | 173,013 |
| T2 | Delay at unstaffed station to non-DOO train | 156,474 |
| M8 | Technical failures above the Solebar | 141,839 |
| TH | (Senior) Conductor/Train Manager | 118,127 |
| TZ | Other Passenger Train Operating Company causes | 106,071 |
| OT | Ops Safety TSR implemented for sighting issues relating to foot crossings, level crossings or signals (Not vegetation caused) | 102,232 |
| OU | Delays not Investigated by Network Rail | 101,591 |
| IB | Points failure (including no fault found) | 79,008 |