151 delay minutes

The biggest share (31%) of the delay picked up at Aberdare in the four weeks to 9 December 2023 came from traincrew problems.

86% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track1711%8% 1 a day, the most in 5 years-
Signals, points and power107%16% 0 a day, more than 2 of the other 4 years-
Weather and structures--7% 0 a day, the least in 5 years-
Autumn--7% 0 a day, the least in 5 years-
External--4% 0 a day, the least in 5 years-
Network management149%17% 1 a day, more than 1 of the other 4 years1
The operators' causes
Train faults4630%16% 2 a day, more than 3 of the other 4 years10
Traincrew4731%11% 2 a day, more than 3 of the other 4 years-
Stations117%3% 0 a day, more than 1 of the other 4 years-
Operations64%5% 0 a day, more than 2 of the other 4 years-
Operator, other--7% 0 a day, the least in 5 years-

Period by period

Delay minutes a day, period by period. Gridlines every 10 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
TGDriver33
JATSR speed restrictions for track work outside of the Timetable Planning Rules17
MUDepot operating problem17
TITraincrew rostering problem14
MDTechnical failures below the solebar11
J3Axle Counter Failure10
RQUn-booked assistance for a person with reduced mobility joining/alighting,10
MCDiesel Loco failure, defect, attention7
MNBrake and brake systems faults; including wheel flats where no other cause had been identified7
Q1Takeback Pumps7
Since 2018
CodeWhat Network Rail loggedMinutes
TGDriver651
ICTrack circuit failure (including no fault found)581
JATSR speed restrictions for track work outside of the Timetable Planning Rules436
TH(Senior) Conductor/Train Manager408
OUDelays not Investigated by Network Rail403
M8Technical failures above the Solebar365
T2Delay at unstaffed station to non-DOO train351
IBPoints failure (including no fault found)318
TZOther Passenger Train Operating Company causes300
J3Axle Counter Failure290