Accrington
14 delay minutes
Most of the delay picked up at Accrington in the four weeks to 9 December 2023 came from how the network was run.
0% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | Trains cancelled |
|---|---|---|---|---|
| Network Rail's causes | ||||
| Track | - | - | 8% | - |
| Signals, points and power | - | - | 16% | - |
| Weather and structures | - | - | 7% | - |
| Autumn | - | - | 7% | - |
| External | - | - | 4% | 1 |
| Network management | 14 | 100% | 17% | 1 |
| The operators' causes | ||||
| Train faults | - | - | 16% | 1 |
| Traincrew | - | - | 11% | - |
| Stations | - | - | 3% | - |
| Operations | - | - | 5% | - |
| Operator, other | - | - | 7% | - |
Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| I5 | Possession over-run from planned work | 14 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| MD | Technical failures below the solebar | 190 |
| TG | Driver | 184 |
| XP | BRIDGE HIT | 132 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 117 |
| MS | Planned underpowered or shortformed service and or vehicle, incl. exam set swaps | 112 |
| IC | Track circuit failure (including no fault found) | 104 |
| Q1 | Takeback Pumps | 94 |
| TH | (Senior) Conductor/Train Manager | 89 |
| M8 | Technical failures above the Solebar | 85 |
| Q3 | NZ Pumps T | 81 |