678 delay minutes

The biggest share (30%) of the delay picked up at Ascot in the four weeks to 9 December 2023 came from signal, points and power faults.

56% of these minutes were knock-on from something that happened elsewhere first. 94% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track162%8% 1 a day, more than 1 of the other 4 years9
Signals, points and power20130%16% 7 a day, more than 3 of the other 4 years10
Weather and structures375%7% 1 a day, more than 3 of the other 4 years5
Autumn8913%7% 3 a day, more than 3 of the other 4 years-
External244%4% 1 a day, more than 2 of the other 4 years-
Network management11617%17% 4 a day, the least in 5 years1
The operators' causes
Train faults426%16% 2 a day, the least in 5 years3
Traincrew183%11% 1 a day, the least in 5 years21
Stations355%3% 1 a day, more than 1 of the other 4 years-
Operations--5% 0 a day, the least in 5 years5
Operator, other10015%7% 4 a day, more than 2 of the other 4 years1

Period by period

Delay minutes a day, period by period. Gridlines every 20 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
IBPoints failure (including no fault found)91
Q3NZ Pumps T79
TTLeaf fall Neutral79
ICTrack circuit failure (including no fault found)52
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)51
IESignalling Functional Power Supply Failure35
T2Delay at unstaffed station to non-DOO train32
OKDelay caused by Operating staff oversight, issues or absence (excluding signallers and Control)29
IVCutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure)19
I6Delays as a result of line blocks / track patrols (including late handback)18
Since 2018
CodeWhat Network Rail loggedMinutes
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)3,721
ICTrack circuit failure (including no fault found)3,002
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.1,896
IBPoints failure (including no fault found)1,770
TGDriver1,686
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure1,604
XOExternal trees, building or structures encroaching or falling onto network infrastructure (not weather or vandalism)1,488
JXMiscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains)1,257
TITraincrew rostering problem1,081
XWSevere weather not snow affecting infrastructure the responsibility of Network Rail999