Abercynon
114 delay minutes
The biggest share (45%) of the delay picked up at Abercynon in the four weeks to 9 December 2023 came from faulty trains.
68% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | - | - | 8% | 0 a day, the least in 5 years | - |
| Signals, points and power | 3 | 3% | 16% | 0 a day, the least in 5 years | - |
| Weather and structures | - | - | 7% | 0 a day, the least in 5 years | - |
| Autumn | - | - | 7% | 0 a day, the least in 5 years | - |
| External | 8 | 7% | 4% | 0 a day, more than 1 of the other 4 years | - |
| Network management | 7 | 6% | 17% | 0 a day, the least in 5 years | - |
| The operators' causes | |||||
| Train faults | 51 | 45% | 16% | 2 a day, more than 1 of the other 4 years | - |
| Traincrew | 23 | 20% | 11% | 1 a day, the least in 5 years | - |
| Stations | - | - | 3% | 0 a day, the least in 5 years | - |
| Operations | 22 | 19% | 5% | 1 a day, more than 1 of the other 4 years | - |
| Operator, other | - | - | 7% | 0 a day, the least in 5 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TZ | Other Passenger Train Operating Company causes | 22 |
| M8 | Technical failures above the Solebar | 14 |
| MT | Confirmed train borne safety system faults (not cab based) | 12 |
| TG | Driver | 12 |
| TI | Traincrew rostering problem | 11 |
| XO | External trees, building or structures encroaching or falling onto network infrastructure (not weather or vandalism) | 8 |
| MU | Depot operating problem | 7 |
| MD | Technical failures below the solebar | 6 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 6 |
| JP | Failure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards | 4 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| T2 | Delay at unstaffed station to non-DOO train | 1,408 |
| IC | Track circuit failure (including no fault found) | 1,111 |
| TG | Driver | 1,092 |
| MS | Planned underpowered or shortformed service and or vehicle, incl. exam set swaps | 1,047 |
| TH | (Senior) Conductor/Train Manager | 1,002 |
| OU | Delays not Investigated by Network Rail | 965 |
| MD | Technical failures below the solebar | 928 |
| IB | Points failure (including no fault found) | 674 |
| TZ | Other Passenger Train Operating Company causes | 657 |
| M8 | Technical failures above the Solebar | 649 |