Andover
726 delay minutes
The biggest share (29%) of the delay picked up at Andover in the four weeks to 9 December 2023 came from how the network was run.
69% of these minutes were knock-on from something that happened elsewhere first. 99% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 36 | 5% | 8% | 1 a day, more than 1 of the other 4 years | - |
| Signals, points and power | 105 | 14% | 16% | 4 a day, more than 3 of the other 4 years | - |
| Weather and structures | 10 | 1% | 7% | 0 a day, the least in 5 years | - |
| Autumn | 135 | 19% | 7% | 5 a day, more than 2 of the other 4 years | - |
| External | 44 | 6% | 4% | 2 a day, more than 3 of the other 4 years | - |
| Network management | 209 | 29% | 17% | 7 a day, more than 2 of the other 4 years | - |
| The operators' causes | |||||
| Train faults | 30 | 4% | 16% | 1 a day, the least in 5 years | - |
| Traincrew | 49 | 7% | 11% | 2 a day, more than 3 of the other 4 years | - |
| Stations | 9 | 1% | 3% | 0 a day, the least in 5 years | - |
| Operations | 9 | 1% | 5% | 0 a day, more than 1 of the other 4 years | - |
| Operator, other | 91 | 12% | 7% | 3 a day, more than 1 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| Q3 | NZ Pumps T | 68 |
| TT | Leaf fall Neutral | 68 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 48 |
| IB | Points failure (including no fault found) | 37 |
| QM | Train schedule/STP Process including erroneous simplifiers | 35 |
| TG | Driver | 34 |
| II | Signalling lineside cable fault | 29 |
| QH | Adhesion problems due to leaf contamination | 29 |
| XK | National Grid Power Failure - local area also affected (inc outage, surges, blips where working standby generator/UPS installed) | 26 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 25 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 2,298 |
| X4 | Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions | 1,455 |
| MD | Technical failures below the solebar | 1,414 |
| IB | Points failure (including no fault found) | 1,376 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 1,345 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 1,243 |
| IC | Track circuit failure (including no fault found) | 1,231 |
| TG | Driver | 1,074 |
| XP | BRIDGE HIT | 942 |
| II | Signalling lineside cable fault | 933 |