0 delay minutes

No delay was picked up at Ashford (Surrey) in the four weeks to 9 December 2023.

100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideTrains cancelled
Network Rail's causes
Track--8%-
Signals, points and power--16%-
Weather and structures--7%-
Autumn--7%-
External--4%-
Network management--17%-
The operators' causes
Train faults--16%-
Traincrew--11%-
Stations--3%-
Operations--5%-
Operator, other--7%-

Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.

Period by period

Delay minutes a day, period by period. Gridlines every 1 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
Nothing logged.
Since 2018
CodeWhat Network Rail loggedMinutes
JXMiscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains)19
TGDriver18
IBPoints failure (including no fault found)11
I6Delays as a result of line blocks / track patrols (including late handback)10
I4OHLE/third rail power supply failure or reduction9
XOExternal trees, building or structures encroaching or falling onto network infrastructure (not weather or vandalism)6
IJAWS/ATP/TPWS/Train stop/On track equipment failure6
JLSafety related incident caused by maintenance or infrastructure staff oversight or error (not Operations staff)2