Ashford (Surrey)
0 delay minutes
No delay was picked up at Ashford (Surrey) in the four weeks to 9 December 2023.
100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | Trains cancelled |
|---|---|---|---|---|
| Network Rail's causes | ||||
| Track | - | - | 8% | - |
| Signals, points and power | - | - | 16% | - |
| Weather and structures | - | - | 7% | - |
| Autumn | - | - | 7% | - |
| External | - | - | 4% | - |
| Network management | - | - | 17% | - |
| The operators' causes | ||||
| Train faults | - | - | 16% | - |
| Traincrew | - | - | 11% | - |
| Stations | - | - | 3% | - |
| Operations | - | - | 5% | - |
| Operator, other | - | - | 7% | - |
Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| Nothing logged. | ||
| Code | What Network Rail logged | Minutes |
|---|---|---|
| JX | Miscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains) | 19 |
| TG | Driver | 18 |
| IB | Points failure (including no fault found) | 11 |
| I6 | Delays as a result of line blocks / track patrols (including late handback) | 10 |
| I4 | OHLE/third rail power supply failure or reduction | 9 |
| XO | External trees, building or structures encroaching or falling onto network infrastructure (not weather or vandalism) | 6 |
| IJ | AWS/ATP/TPWS/Train stop/On track equipment failure | 6 |
| JL | Safety related incident caused by maintenance or infrastructure staff oversight or error (not Operations staff) | 2 |