Aldershot
1,010 delay minutes
The biggest share (35%) of the delay picked up at Aldershot in the four weeks to 9 December 2023 came from signal, points and power faults.
53% of these minutes were knock-on from something that happened elsewhere first. 94% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 41 | 4% | 8% | 1 a day, more than 2 of the other 4 years | - |
| Signals, points and power | 358 | 35% | 16% | 13 a day, the most in 5 years | 10 |
| Weather and structures | 62 | 6% | 7% | 2 a day, more than 3 of the other 4 years | 5 |
| Autumn | 9 | <1% | 7% | 0 a day, more than 1 of the other 4 years | - |
| External | 201 | 20% | 4% | 7 a day, the most in 5 years | - |
| Network management | 96 | 10% | 17% | 3 a day, the least in 5 years | 3 |
| The operators' causes | |||||
| Train faults | 72 | 7% | 16% | 3 a day, more than 2 of the other 4 years | 1 |
| Traincrew | 106 | 10% | 11% | 4 a day, more than 3 of the other 4 years | 28 |
| Stations | 4 | <1% | 3% | 0 a day, more than 1 of the other 4 years | - |
| Operations | 14 | 1% | 5% | 1 a day, more than 2 of the other 4 years | 3 |
| Operator, other | 48 | 5% | 7% | 2 a day, more than 2 of the other 4 years | 7 |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IB | Points failure (including no fault found) | 280 |
| XO | External trees, building or structures encroaching or falling onto network infrastructure (not weather or vandalism) | 98 |
| XK | National Grid Power Failure - local area also affected (inc outage, surges, blips where working standby generator/UPS installed) | 82 |
| TG | Driver | 62 |
| IE | Signalling Functional Power Supply Failure | 54 |
| JD | Structures - Bridges/tunnels/buildings/retaining walls/sea defences (not bridge strikes) | 51 |
| TI | Traincrew rostering problem | 38 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 36 |
| VZ | Other passenger or external causes the responsibility of TOC | 36 |
| MU | Depot operating problem | 28 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IC | Track circuit failure (including no fault found) | 4,095 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 3,042 |
| TG | Driver | 1,973 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 1,859 |
| IB | Points failure (including no fault found) | 1,689 |
| TH | (Senior) Conductor/Train Manager | 1,300 |
| MD | Technical failures below the solebar | 1,160 |
| XO | External trees, building or structures encroaching or falling onto network infrastructure (not weather or vandalism) | 1,144 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 1,088 |
| JX | Miscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains) | 1,062 |