Ash Vale
1,589 delay minutes
The biggest share (36%) of the delay picked up at Ash Vale in the four weeks to 9 December 2023 came from signal, points and power faults.
43% of these minutes were knock-on from something that happened elsewhere first. 92% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 99 | 6% | 8% | 4 a day, more than 2 of the other 4 years | - |
| Signals, points and power | 575 | 36% | 16% | 21 a day, the most in 5 years | - |
| Weather and structures | 191 | 12% | 7% | 7 a day, the most in 5 years | - |
| Autumn | 181 | 11% | 7% | 6 a day, more than 3 of the other 4 years | - |
| External | 36 | 2% | 4% | 1 a day, more than 2 of the other 4 years | - |
| Network management | 130 | 8% | 17% | 5 a day, more than 1 of the other 4 years | - |
| The operators' causes | |||||
| Train faults | 68 | 4% | 16% | 2 a day, more than 3 of the other 4 years | - |
| Traincrew | 74 | 5% | 11% | 3 a day, the most in 5 years | - |
| Stations | 18 | 1% | 3% | 1 a day, more than 1 of the other 4 years | - |
| Operations | 27 | 2% | 5% | 1 a day, the most in 5 years | - |
| Operator, other | 190 | 12% | 7% | 7 a day, more than 2 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IB | Points failure (including no fault found) | 465 |
| JD | Structures - Bridges/tunnels/buildings/retaining walls/sea defences (not bridge strikes) | 183 |
| Q3 | NZ Pumps T | 140 |
| TT | Leaf fall Neutral | 140 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 67 |
| IE | Signalling Functional Power Supply Failure | 57 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 38 |
| TG | Driver | 34 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 32 |
| VZ | Other passenger or external causes the responsibility of TOC | 29 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 3,380 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 2,561 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 2,512 |
| IB | Points failure (including no fault found) | 2,351 |
| IC | Track circuit failure (including no fault found) | 1,959 |
| TG | Driver | 1,132 |
| TT | Leaf fall Neutral | 1,090 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 1,089 |
| MD | Technical failures below the solebar | 832 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 812 |