444 delay minutes

The biggest share (45%) of the delay picked up at Aigburth in the four weeks to 9 December 2023 came from faulty trains.

61% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track317%8% 1 a day, the most in 5 years-
Signals, points and power4410%16% 2 a day, more than 2 of the other 4 years-
Weather and structures82%7% 0 a day, more than 3 of the other 4 years-
Autumn7918%7% 3 a day, the most in 5 years-
External82%4% 0 a day, the most in 5 years-
Network management348%17% 1 a day, more than 2 of the other 4 years-
The operators' causes
Train faults19845%16% 7 a day, the most in 5 years-
Traincrew215%11% 1 a day, more than 3 of the other 4 years-
Stations--3% 0 a day, the least in 5 years-
Operations92%5% 0 a day, more than 2 of the other 4 years-
Operator, other133%7% 0 a day, more than 2 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 5 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
MDTechnical failures below the solebar98
Q3NZ Pumps T76
M8Technical failures above the Solebar47
IJAWS/ATP/TPWS/Train stop/On track equipment failure38
M7Door and Door system faults32
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.28
TH(Senior) Conductor/Train Manager13
TTLeaf fall Neutral13
M0Confirmed train cab based safety system fault (including GSMR)11
OHARS / TMS / SARS software problem (excluding scheduling issues and technical failures)11
Since 2018
CodeWhat Network Rail loggedMinutes
OHARS / TMS / SARS software problem (excluding scheduling issues and technical failures)864
ICTrack circuit failure (including no fault found)863
MDTechnical failures below the solebar839
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)746
TOTime lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility)496
IASignal failure (including no fault found)457
M8Technical failures above the Solebar406
TH(Senior) Conductor/Train Manager402
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.334
OSLate start or delays to Railhead Conditioning or Ghost Train due to its own activity and not in reaction to another incident332