Alderley Edge
1,072 delay minutes
The biggest share (19%) of the delay picked up at Alderley Edge in the four weeks to 9 December 2023 came from how the network was run.
63% of these minutes were knock-on from something that happened elsewhere first. 78% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 79 | 7% | 8% | 3 a day, the most in 5 years | - |
| Signals, points and power | 128 | 12% | 16% | 5 a day, more than 2 of the other 4 years | - |
| Weather and structures | 129 | 12% | 7% | 5 a day, the most in 5 years | - |
| Autumn | 103 | 10% | 7% | 4 a day, the most in 5 years | - |
| External | 14 | 1% | 4% | 1 a day, more than 2 of the other 4 years | - |
| Network management | 206 | 19% | 17% | 7 a day, the most in 5 years | 26 |
| The operators' causes | |||||
| Train faults | 128 | 12% | 16% | 5 a day, the least in 5 years | 5 |
| Traincrew | 73 | 7% | 11% | 3 a day, more than 3 of the other 4 years | 4 |
| Stations | 32 | 3% | 3% | 1 a day, more than 2 of the other 4 years | - |
| Operations | 22 | 2% | 5% | 1 a day, the least in 5 years | 3 |
| Operator, other | 158 | 15% | 7% | 6 a day, the most in 5 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| XW | Severe weather not snow affecting infrastructure the responsibility of Network Rail | 113 |
| Q3 | NZ Pumps T | 87 |
| TT | Leaf fall Neutral | 87 |
| OD | Delays due to National/Regional/Route Operations directives or Route Control decision or directive | 66 |
| OU | Delays not Investigated by Network Rail | 65 |
| MP | Rail / wheel interface, adhesion problems (including ice on the running rail) | 64 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 59 |
| IB | Points failure (including no fault found) | 48 |
| TG | Driver | 48 |
| IC | Track circuit failure (including no fault found) | 44 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| MS | Planned underpowered or shortformed service and or vehicle, incl. exam set swaps | 2,364 |
| MD | Technical failures below the solebar | 2,329 |
| TG | Driver | 1,940 |
| IC | Track circuit failure (including no fault found) | 1,769 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 1,666 |
| IB | Points failure (including no fault found) | 1,643 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 1,258 |
| I1 | Overhead line/third rail defect | 1,041 |
| X2 | Severe flooding beyond that which could be mitigated on Network Rail infrastructure | 1,005 |
| M8 | Technical failures above the Solebar | 987 |