Alton
553 delay minutes
The biggest share (21%) of the delay picked up at Alton in the four weeks to 9 December 2023 came from signal, points and power faults.
86% of these minutes were knock-on from something that happened elsewhere first. 99% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 57 | 10% | 8% | 2 a day, more than 2 of the other 4 years | - |
| Signals, points and power | 116 | 21% | 16% | 4 a day, more than 3 of the other 4 years | 8 |
| Weather and structures | 36 | 7% | 7% | 1 a day, the most in 5 years | 11 |
| Autumn | 24 | 4% | 7% | 1 a day, more than 2 of the other 4 years | - |
| External | 29 | 5% | 4% | 1 a day, more than 2 of the other 4 years | 1 |
| Network management | 83 | 15% | 17% | 3 a day, more than 1 of the other 4 years | 2 |
| The operators' causes | |||||
| Train faults | 51 | 9% | 16% | 2 a day, more than 3 of the other 4 years | 2 |
| Traincrew | 63 | 11% | 11% | 2 a day, more than 3 of the other 4 years | 7 |
| Stations | 3 | <1% | 3% | 0 a day, more than 1 of the other 4 years | - |
| Operations | 28 | 5% | 5% | 1 a day, the most in 5 years | 3 |
| Operator, other | 63 | 11% | 7% | 2 a day, more than 3 of the other 4 years | 1 |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IB | Points failure (including no fault found) | 93 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 53 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 41 |
| VZ | Other passenger or external causes the responsibility of TOC | 33 |
| IV | Cutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure) | 29 |
| TB | Train cancelled or delayed at Train Operators request | 28 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 27 |
| TH | (Senior) Conductor/Train Manager | 27 |
| XK | National Grid Power Failure - local area also affected (inc outage, surges, blips where working standby generator/UPS installed) | 23 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 23 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 9,948 |
| IC | Track circuit failure (including no fault found) | 1,649 |
| IB | Points failure (including no fault found) | 1,294 |
| JX | Miscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains) | 1,149 |
| IV | Cutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure) | 1,001 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 966 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 964 |
| MD | Technical failures below the solebar | 867 |
| TH | (Senior) Conductor/Train Manager | 726 |
| TG | Driver | 683 |