Leaves on the Line

Alton

AON Wessex route
CSV JSON

553 delay minutes

The biggest share (21%) of the delay picked up at Alton in the four weeks to 9 December 2023 came from signal, points and power faults.

86% of these minutes were knock-on from something that happened elsewhere first. 99% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track5710%8% 2 a day, more than 2 of the other 4 years-
Signals, points and power11621%16% 4 a day, more than 3 of the other 4 years8
Weather and structures367%7% 1 a day, the most in 5 years11
Autumn244%7% 1 a day, more than 2 of the other 4 years-
External295%4% 1 a day, more than 2 of the other 4 years1
Network management8315%17% 3 a day, more than 1 of the other 4 years2
The operators' causes
Train faults519%16% 2 a day, more than 3 of the other 4 years2
Traincrew6311%11% 2 a day, more than 3 of the other 4 years7
Stations3<1%3% 0 a day, more than 1 of the other 4 years-
Operations285%5% 1 a day, the most in 5 years3
Operator, other6311%7% 2 a day, more than 3 of the other 4 years1

Period by period

Delay minutes a day, period by period. Gridlines every 20 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
IBPoints failure (including no fault found)93
IRBroken/cracked/twisted/buckled/flawed rail53
OCSignaller including mis-routing (not ERTM /ETCS related)41
VZOther passenger or external causes the responsibility of TOC33
IVCutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure)29
TBTrain cancelled or delayed at Train Operators request28
MNBrake and brake systems faults; including wheel flats where no other cause had been identified27
TH(Senior) Conductor/Train Manager27
XKNational Grid Power Failure - local area also affected (inc outage, surges, blips where working standby generator/UPS installed)23
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)23
Since 2018
CodeWhat Network Rail loggedMinutes
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.9,948
ICTrack circuit failure (including no fault found)1,649
IBPoints failure (including no fault found)1,294
JXMiscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains)1,149
IVCutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure)1,001
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)966
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure964
MDTechnical failures below the solebar867
TH(Senior) Conductor/Train Manager726
TGDriver683