143 delay minutes
The biggest share (36%) of the delay picked up at Appledore (Kent) in the four weeks to 9 December 2023 came from signal, points and power faults.
43% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | Trains cancelled |
|---|---|---|---|---|
| Network Rail's causes | ||||
| Track | - | - | 8% | - |
| Signals, points and power | 51 | 36% | 16% | - |
| Weather and structures | - | - | 7% | - |
| Autumn | 12 | 8% | 7% | - |
| External | - | - | 4% | - |
| Network management | 44 | 31% | 17% | - |
| The operators' causes | ||||
| Train faults | 9 | 6% | 16% | - |
| Traincrew | - | - | 11% | - |
| Stations | - | - | 3% | - |
| Operations | - | - | 5% | - |
| Operator, other | 28 | 19% | 7% | - |
Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IG | Block failure | 23 |
| IK | Telecom equipment failure (including no fault found) | 22 |
| MP | Rail / wheel interface, adhesion problems (including ice on the running rail) | 16 |
| JX | Miscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains) | 15 |
| Q3 | NZ Pumps T | 12 |
| TT | Leaf fall Neutral | 12 |
| OS | Late start or delays to Railhead Conditioning or Ghost Train due to its own activity and not in reaction to another incident | 9 |
| OD | Delays due to National/Regional/Route Operations directives or Route Control decision or directive | 8 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 7 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 6 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 639 |
| TG | Driver | 408 |
| IC | Track circuit failure (including no fault found) | 399 |
| ID | Level crossing faults and failure incl. barrow/foot crossings and crossing treadles | 353 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 350 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 331 |
| OS | Late start or delays to Railhead Conditioning or Ghost Train due to its own activity and not in reaction to another incident | 144 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 123 |
| MD | Technical failures below the solebar | 118 |
| IG | Block failure | 112 |