Leaves on the Line

Appledore (Kent)

APD Kent route
CSV JSON

143 delay minutes

The biggest share (36%) of the delay picked up at Appledore (Kent) in the four weeks to 9 December 2023 came from signal, points and power faults.

43% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideTrains cancelled
Network Rail's causes
Track--8%-
Signals, points and power5136%16%-
Weather and structures--7%-
Autumn128%7%-
External--4%-
Network management4431%17%-
The operators' causes
Train faults96%16%-
Traincrew--11%-
Stations--3%-
Operations--5%-
Operator, other2819%7%-

Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.

Period by period

Delay minutes a day, period by period. Gridlines every 5 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
IGBlock failure23
IKTelecom equipment failure (including no fault found)22
MPRail / wheel interface, adhesion problems (including ice on the running rail)16
JXMiscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains)15
Q3NZ Pumps T12
TTLeaf fall Neutral12
OSLate start or delays to Railhead Conditioning or Ghost Train due to its own activity and not in reaction to another incident9
ODDelays due to National/Regional/Route Operations directives or Route Control decision or directive8
OCSignaller including mis-routing (not ERTM /ETCS related)7
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure6
Since 2018
CodeWhat Network Rail loggedMinutes
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.639
TGDriver408
ICTrack circuit failure (including no fault found)399
IDLevel crossing faults and failure incl. barrow/foot crossings and crossing treadles353
OCSignaller including mis-routing (not ERTM /ETCS related)350
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)331
OSLate start or delays to Railhead Conditioning or Ghost Train due to its own activity and not in reaction to another incident144
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure123
MDTechnical failures below the solebar118
IGBlock failure112