Arnside
419 delay minutes
The biggest share (18%) of the delay picked up at Arnside in the four weeks to 9 December 2023 came from signal, points and power faults.
55% of these minutes were knock-on from something that happened elsewhere first. 95% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | - | - | 8% | 0 a day, the least in 5 years | - |
| Signals, points and power | 76 | 18% | 16% | 3 a day, more than 2 of the other 4 years | - |
| Weather and structures | 70 | 17% | 7% | 3 a day, the most in 5 years | - |
| Autumn | 49 | 12% | 7% | 2 a day, the most in 5 years | - |
| External | - | - | 4% | 0 a day, the least in 5 years | - |
| Network management | 57 | 13% | 17% | 2 a day, more than 3 of the other 4 years | - |
| The operators' causes | |||||
| Train faults | 48 | 11% | 16% | 2 a day, the least in 5 years | - |
| Traincrew | 35 | 8% | 11% | 1 a day, more than 2 of the other 4 years | - |
| Stations | 12 | 3% | 3% | 0 a day, more than 3 of the other 4 years | - |
| Operations | 22 | 5% | 5% | 1 a day, more than 2 of the other 4 years | - |
| Operator, other | 52 | 12% | 7% | 2 a day, the most in 5 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| Q3 | NZ Pumps T | 49 |
| TT | Leaf fall Neutral | 41 |
| X2 | Severe flooding beyond that which could be mitigated on Network Rail infrastructure | 32 |
| X4 | Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions | 31 |
| IB | Points failure (including no fault found) | 29 |
| IH | Power Supply And Distribution System Failure | 25 |
| TG | Driver | 18 |
| IA | Signal failure (including no fault found) | 14 |
| TH | (Senior) Conductor/Train Manager | 14 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 12 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IB | Points failure (including no fault found) | 1,733 |
| TG | Driver | 1,088 |
| MD | Technical failures below the solebar | 1,028 |
| TO | Time lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility) | 881 |
| RB | Passengers joining/alighting | 783 |
| IA | Signal failure (including no fault found) | 701 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 604 |
| X2 | Severe flooding beyond that which could be mitigated on Network Rail infrastructure | 523 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 514 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 504 |