The biggest share (31%) of the delay picked up at Ashchurch for Tewkesbury in the four weeks to 9 December 2023 came from signal, points and power faults.
73% of these minutes were knock-on from something that happened elsewhere first. 93% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 26 | 5% | 8% | 1 a day, more than 2 of the other 4 years | - |
| Signals, points and power | 180 | 31% | 16% | 6 a day, the most in 5 years | - |
| Weather and structures | 71 | 12% | 7% | 3 a day, more than 2 of the other 4 years | - |
| Autumn | 26 | 4% | 7% | 1 a day, the most in 5 years | - |
| External | 32 | 6% | 4% | 1 a day, more than 2 of the other 4 years | - |
| Network management | 75 | 13% | 17% | 3 a day, more than 2 of the other 4 years | - |
| The operators' causes | |||||
| Train faults | 68 | 12% | 16% | 2 a day, more than 2 of the other 4 years | - |
| Traincrew | 40 | 7% | 11% | 1 a day, more than 3 of the other 4 years | - |
| Stations | 21 | 4% | 3% | 1 a day, more than 3 of the other 4 years | - |
| Operations | 16 | 3% | 5% | 1 a day, the most in 5 years | - |
| Operator, other | 24 | 4% | 7% | 1 a day, the most in 5 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IE | Signalling Functional Power Supply Failure | 66 |
| IB | Points failure (including no fault found) | 47 |
| TG | Driver | 31 |
| JK | Flooding not due to exceptional weather | 29 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 25 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 23 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 20 |
| IA | Signal failure (including no fault found) | 17 |
| IK | Telecom equipment failure (including no fault found) | 17 |
| OU | Delays not Investigated by Network Rail | 17 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IB | Points failure (including no fault found) | 2,366 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 2,300 |
| IK | Telecom equipment failure (including no fault found) | 1,745 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 1,635 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 1,541 |
| ID | Level crossing faults and failure incl. barrow/foot crossings and crossing treadles | 1,532 |
| J3 | Axle Counter Failure | 1,382 |
| X2 | Severe flooding beyond that which could be mitigated on Network Rail infrastructure | 1,133 |
| MD | Technical failures below the solebar | 1,078 |
| IE | Signalling Functional Power Supply Failure | 963 |