Leaves on the Line

Ash

ASH Wessex route
CSV JSON

485 delay minutes

The biggest share (19%) of the delay picked up at Ash in the four weeks to 9 December 2023 came from how the network was run.

55% of these minutes were knock-on from something that happened elsewhere first. 99% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track--8% 0 a day, the least in 5 years-
Signals, points and power8317%16% 3 a day, more than 1 of the other 4 years-
Weather and structures82%7% 0 a day, more than 3 of the other 4 years-
Autumn7014%7% 2 a day, the least in 5 years-
External204%4% 1 a day, more than 2 of the other 4 years-
Network management9019%17% 3 a day, the least in 5 years-
The operators' causes
Train faults5912%16% 2 a day, more than 1 of the other 4 years-
Traincrew6513%11% 2 a day, more than 3 of the other 4 years-
Stations4<1%3% 0 a day, the least in 5 years-
Operations51%5% 0 a day, more than 2 of the other 4 years-
Operator, other8217%7% 3 a day, more than 2 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 100 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
Q3NZ Pumps T63
TTLeaf fall Neutral63
I4OHLE/third rail power supply failure or reduction35
MDTechnical failures below the solebar34
TGDriver31
IBPoints failure (including no fault found)30
TH(Senior) Conductor/Train Manager27
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)23
JPFailure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards17
I6Delays as a result of line blocks / track patrols (including late handback)13
Since 2018
CodeWhat Network Rail loggedMinutes
IVCutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure)9,270
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.8,117
ICTrack circuit failure (including no fault found)2,001
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)1,706
MDTechnical failures below the solebar1,410
TGDriver1,270
ZUNo Cause Identified After investigation by both Parties1,248
TTLeaf fall Neutral1,164
IBPoints failure (including no fault found)1,105
Q3NZ Pumps T1,085