Leaves on the Line

Addlestone

ASN Wessex route
CSV JSON

119 delay minutes

The biggest share (29%) of the delay picked up at Addlestone in the four weeks to 9 December 2023 came from other operator causes.

52% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideTrains cancelled
Network Rail's causes
Track2824%8%-
Signals, points and power--16%-
Weather and structures119%7%-
Autumn97%7%-
External--4%-
Network management1613%17%1
The operators' causes
Train faults2017%16%-
Traincrew--11%-
Stations1<1%3%-
Operations--5%-
Operator, other3529%7%-

Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.

Period by period

Delay minutes a day, period by period. Gridlines every 2 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.25
VHPassenger Communication cord, door egress or emergency train alarm operated23
I5Possession over-run from planned work11
JDStructures - Bridges/tunnels/buildings/retaining walls/sea defences (not bridge strikes)11
MFEngineering non-technical delays associated with Engineering staff who are not based in an Engineering depot e.g. Cleaners10
Q3NZ Pumps T9
TTLeaf fall Neutral9
M7Door and Door system faults7
OCSignaller including mis-routing (not ERTM /ETCS related)4
IRBroken/cracked/twisted/buckled/flawed rail3
Since 2018
CodeWhat Network Rail loggedMinutes
VHPassenger Communication cord, door egress or emergency train alarm operated438
TGDriver436
ICTrack circuit failure (including no fault found)377
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)262
OCSignaller including mis-routing (not ERTM /ETCS related)211
I5Possession over-run from planned work198
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure194
T2Delay at unstaffed station to non-DOO train160
MDTechnical failures below the solebar150
IBPoints failure (including no fault found)149