Aston
2,726 delay minutes
The biggest share (15%) of the delay picked up at Aston in the four weeks to 9 December 2023 came from signal, points and power faults.
69% of these minutes were knock-on from something that happened elsewhere first. 94% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 334 | 12% | 8% | 12 a day, more than 3 of the other 4 years | - |
| Signals, points and power | 401 | 15% | 16% | 14 a day, more than 2 of the other 4 years | - |
| Weather and structures | 49 | 2% | 7% | 2 a day, more than 1 of the other 4 years | - |
| Autumn | 138 | 5% | 7% | 5 a day, the most in 5 years | - |
| External | 325 | 12% | 4% | 12 a day, the most in 5 years | - |
| Network management | 316 | 12% | 17% | 11 a day, more than 1 of the other 4 years | - |
| The operators' causes | |||||
| Train faults | 288 | 11% | 16% | 10 a day, more than 1 of the other 4 years | - |
| Traincrew | 266 | 10% | 11% | 9 a day, more than 2 of the other 4 years | - |
| Stations | 330 | 12% | 3% | 12 a day, the most in 5 years | - |
| Operations | 89 | 3% | 5% | 3 a day, more than 3 of the other 4 years | - |
| Operator, other | 191 | 7% | 7% | 7 a day, more than 1 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| XO | External trees, building or structures encroaching or falling onto network infrastructure (not weather or vandalism) | 288 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 247 |
| TG | Driver | 216 |
| R7 | Station delays as a result of overcrowding due to planned events (e.g. sports fixtures, concerts) | 121 |
| RQ | Un-booked assistance for a person with reduced mobility joining/alighting, | 113 |
| IB | Points failure (including no fault found) | 104 |
| J3 | Axle Counter Failure | 84 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 73 |
| Q3 | NZ Pumps T | 69 |
| VH | Passenger Communication cord, door egress or emergency train alarm operated | 68 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 11,451 |
| IB | Points failure (including no fault found) | 5,796 |
| MD | Technical failures below the solebar | 5,635 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 5,629 |
| TH | (Senior) Conductor/Train Manager | 5,118 |
| M8 | Technical failures above the Solebar | 4,102 |
| I1 | Overhead line/third rail defect | 3,985 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 3,772 |
| IC | Track circuit failure (including no fault found) | 3,476 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 3,473 |