Leaves on the Line

Aston

AST Central route
CSV JSON

2,726 delay minutes

The biggest share (15%) of the delay picked up at Aston in the four weeks to 9 December 2023 came from signal, points and power faults.

69% of these minutes were knock-on from something that happened elsewhere first. 94% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track33412%8% 12 a day, more than 3 of the other 4 years-
Signals, points and power40115%16% 14 a day, more than 2 of the other 4 years-
Weather and structures492%7% 2 a day, more than 1 of the other 4 years-
Autumn1385%7% 5 a day, the most in 5 years-
External32512%4% 12 a day, the most in 5 years-
Network management31612%17% 11 a day, more than 1 of the other 4 years-
The operators' causes
Train faults28811%16% 10 a day, more than 1 of the other 4 years-
Traincrew26610%11% 9 a day, more than 2 of the other 4 years-
Stations33012%3% 12 a day, the most in 5 years-
Operations893%5% 3 a day, more than 3 of the other 4 years-
Operator, other1917%7% 7 a day, more than 1 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 50 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
XOExternal trees, building or structures encroaching or falling onto network infrastructure (not weather or vandalism)288
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.247
TGDriver216
R7Station delays as a result of overcrowding due to planned events (e.g. sports fixtures, concerts)121
RQUn-booked assistance for a person with reduced mobility joining/alighting,113
IBPoints failure (including no fault found)104
J3Axle Counter Failure84
MNBrake and brake systems faults; including wheel flats where no other cause had been identified73
Q3NZ Pumps T69
VHPassenger Communication cord, door egress or emergency train alarm operated68
Since 2018
CodeWhat Network Rail loggedMinutes
TGDriver11,451
IBPoints failure (including no fault found)5,796
MDTechnical failures below the solebar5,635
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.5,629
TH(Senior) Conductor/Train Manager5,118
M8Technical failures above the Solebar4,102
I1Overhead line/third rail defect3,985
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)3,772
ICTrack circuit failure (including no fault found)3,476
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure3,473