Leaves on the Line

Attleborough

ATL Anglia route
CSV JSON

1,619 delay minutes

The biggest share (32%) of the delay picked up at Attleborough in the four weeks to 9 December 2023 came from how the network was run.

25% of these minutes were knock-on from something that happened elsewhere first. 60% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track30119%8% 11 a day, more than 3 of the other 4 years-
Signals, points and power21013%16% 8 a day, more than 2 of the other 4 years-
Weather and structures3<1%7% 0 a day, more than 2 of the other 4 years-
Autumn45828%7% 16 a day, the most in 5 years-
External322%4% 1 a day, more than 2 of the other 4 years-
Network management51532%17% 18 a day, the most in 5 years-
The operators' causes
Train faults453%16% 2 a day, more than 2 of the other 4 years-
Traincrew352%11% 1 a day, more than 2 of the other 4 years-
Stations--3% 0 a day, the least in 5 years-
Operations3<1%5% 0 a day, more than 1 of the other 4 years-
Operator, other171%7% 1 a day, more than 2 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 20 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
QJSpecial working for leaf-fall track circuit operation433
JSCondition of Track TSR outside the Timetable Planning Rules284
OTOps Safety TSR implemented for sighting issues relating to foot crossings, level crossings or signals (Not vegetation caused)280
JPFailure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards119
IISignalling lineside cable fault63
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure62
IDLevel crossing faults and failure incl. barrow/foot crossings and crossing treadles55
OSLate start or delays to Railhead Conditioning or Ghost Train due to its own activity and not in reaction to another incident32
Q1Takeback Pumps25
TGDriver25
Since 2018
CodeWhat Network Rail loggedMinutes
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.8,028
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)7,365
OTOps Safety TSR implemented for sighting issues relating to foot crossings, level crossings or signals (Not vegetation caused)4,641
IDLevel crossing faults and failure incl. barrow/foot crossings and crossing treadles2,398
MDTechnical failures below the solebar1,667
TGDriver978
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure948
IRBroken/cracked/twisted/buckled/flawed rail816
QJSpecial working for leaf-fall track circuit operation815
JSCondition of Track TSR outside the Timetable Planning Rules760