Attleborough
1,619 delay minutes
The biggest share (32%) of the delay picked up at Attleborough in the four weeks to 9 December 2023 came from how the network was run.
25% of these minutes were knock-on from something that happened elsewhere first. 60% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 301 | 19% | 8% | 11 a day, more than 3 of the other 4 years | - |
| Signals, points and power | 210 | 13% | 16% | 8 a day, more than 2 of the other 4 years | - |
| Weather and structures | 3 | <1% | 7% | 0 a day, more than 2 of the other 4 years | - |
| Autumn | 458 | 28% | 7% | 16 a day, the most in 5 years | - |
| External | 32 | 2% | 4% | 1 a day, more than 2 of the other 4 years | - |
| Network management | 515 | 32% | 17% | 18 a day, the most in 5 years | - |
| The operators' causes | |||||
| Train faults | 45 | 3% | 16% | 2 a day, more than 2 of the other 4 years | - |
| Traincrew | 35 | 2% | 11% | 1 a day, more than 2 of the other 4 years | - |
| Stations | - | - | 3% | 0 a day, the least in 5 years | - |
| Operations | 3 | <1% | 5% | 0 a day, more than 1 of the other 4 years | - |
| Operator, other | 17 | 1% | 7% | 1 a day, more than 2 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| QJ | Special working for leaf-fall track circuit operation | 433 |
| JS | Condition of Track TSR outside the Timetable Planning Rules | 284 |
| OT | Ops Safety TSR implemented for sighting issues relating to foot crossings, level crossings or signals (Not vegetation caused) | 280 |
| JP | Failure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards | 119 |
| II | Signalling lineside cable fault | 63 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 62 |
| ID | Level crossing faults and failure incl. barrow/foot crossings and crossing treadles | 55 |
| OS | Late start or delays to Railhead Conditioning or Ghost Train due to its own activity and not in reaction to another incident | 32 |
| Q1 | Takeback Pumps | 25 |
| TG | Driver | 25 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 8,028 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 7,365 |
| OT | Ops Safety TSR implemented for sighting issues relating to foot crossings, level crossings or signals (Not vegetation caused) | 4,641 |
| ID | Level crossing faults and failure incl. barrow/foot crossings and crossing treadles | 2,398 |
| MD | Technical failures below the solebar | 1,667 |
| TG | Driver | 978 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 948 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 816 |
| QJ | Special working for leaf-fall track circuit operation | 815 |
| JS | Condition of Track TSR outside the Timetable Planning Rules | 760 |