Audley End
1,496 delay minutes
The biggest share (28%) of the delay picked up at Audley End in the four weeks to 9 December 2023 came from how the network was run.
56% of these minutes were knock-on from something that happened elsewhere first. 86% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 339 | 23% | 8% | 12 a day, more than 2 of the other 4 years | 3 |
| Signals, points and power | 168 | 11% | 16% | 6 a day, more than 1 of the other 4 years | - |
| Weather and structures | 53 | 4% | 7% | 2 a day, more than 3 of the other 4 years | - |
| Autumn | 56 | 4% | 7% | 2 a day, more than 3 of the other 4 years | - |
| External | 80 | 5% | 4% | 3 a day, more than 2 of the other 4 years | - |
| Network management | 425 | 28% | 17% | 15 a day, the most in 5 years | 1 |
| The operators' causes | |||||
| Train faults | 197 | 13% | 16% | 7 a day, more than 2 of the other 4 years | - |
| Traincrew | 95 | 6% | 11% | 3 a day, more than 2 of the other 4 years | - |
| Stations | 4 | <1% | 3% | 0 a day, the least in 5 years | - |
| Operations | 10 | <1% | 5% | 0 a day, the least in 5 years | - |
| Operator, other | 69 | 5% | 7% | 2 a day, more than 3 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| JL | Safety related incident caused by maintenance or infrastructure staff oversight or error (not Operations staff) | 156 |
| JS | Condition of Track TSR outside the Timetable Planning Rules | 134 |
| JA | TSR speed restrictions for track work outside of the Timetable Planning Rules | 118 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 116 |
| M7 | Door and Door system faults | 91 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 78 |
| TG | Driver | 78 |
| XP | BRIDGE HIT | 74 |
| M8 | Technical failures above the Solebar | 64 |
| OK | Delay caused by Operating staff oversight, issues or absence (excluding signallers and Control) | 62 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 9,495 |
| TG | Driver | 4,804 |
| M8 | Technical failures above the Solebar | 3,191 |
| MD | Technical failures below the solebar | 3,052 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 2,823 |
| IB | Points failure (including no fault found) | 2,440 |
| M7 | Door and Door system faults | 2,338 |
| I1 | Overhead line/third rail defect | 1,933 |
| IC | Track circuit failure (including no fault found) | 1,908 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 1,653 |