Audley End

AUD Anglia route
CSV JSON

1,496 delay minutes

The biggest share (28%) of the delay picked up at Audley End in the four weeks to 9 December 2023 came from how the network was run.

56% of these minutes were knock-on from something that happened elsewhere first. 86% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track33923%8% 12 a day, more than 2 of the other 4 years3
Signals, points and power16811%16% 6 a day, more than 1 of the other 4 years-
Weather and structures534%7% 2 a day, more than 3 of the other 4 years-
Autumn564%7% 2 a day, more than 3 of the other 4 years-
External805%4% 3 a day, more than 2 of the other 4 years-
Network management42528%17% 15 a day, the most in 5 years1
The operators' causes
Train faults19713%16% 7 a day, more than 2 of the other 4 years-
Traincrew956%11% 3 a day, more than 2 of the other 4 years-
Stations4<1%3% 0 a day, the least in 5 years-
Operations10<1%5% 0 a day, the least in 5 years-
Operator, other695%7% 2 a day, more than 3 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 20 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
JLSafety related incident caused by maintenance or infrastructure staff oversight or error (not Operations staff)156
JSCondition of Track TSR outside the Timetable Planning Rules134
JATSR speed restrictions for track work outside of the Timetable Planning Rules118
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure116
M7Door and Door system faults91
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.78
TGDriver78
XPBRIDGE HIT74
M8Technical failures above the Solebar64
OKDelay caused by Operating staff oversight, issues or absence (excluding signallers and Control)62
Since 2018
CodeWhat Network Rail loggedMinutes
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.9,495
TGDriver4,804
M8Technical failures above the Solebar3,191
MDTechnical failures below the solebar3,052
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure2,823
IBPoints failure (including no fault found)2,440
M7Door and Door system faults2,338
I1Overhead line/third rail defect1,933
ICTrack circuit failure (including no fault found)1,908
IRBroken/cracked/twisted/buckled/flawed rail1,653