Ascott-under-Wychwood
1,348 delay minutes
Most of the delay picked up at Ascott-under-Wychwood in the four weeks to 9 December 2023 came from weather and structures.
19% of these minutes were knock-on from something that happened elsewhere first. 96% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 58 | 4% | 8% | 2 a day, more than 2 of the other 4 years | - |
| Signals, points and power | 298 | 22% | 16% | 11 a day, the most in 5 years | - |
| Weather and structures | 748 | 55% | 7% | 27 a day, the most in 5 years | - |
| Autumn | 21 | 2% | 7% | 1 a day, more than 1 of the other 4 years | - |
| External | - | - | 4% | 0 a day, the least in 5 years | - |
| Network management | 104 | 8% | 17% | 4 a day, the most in 5 years | - |
| The operators' causes | |||||
| Train faults | 72 | 5% | 16% | 3 a day, more than 1 of the other 4 years | - |
| Traincrew | 33 | 2% | 11% | 1 a day, the most in 5 years | - |
| Stations | - | - | 3% | 0 a day, the least in 5 years | - |
| Operations | - | - | 5% | 0 a day, the least in 5 years | - |
| Operator, other | 15 | 1% | 7% | 1 a day, more than 1 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| JD | Structures - Bridges/tunnels/buildings/retaining walls/sea defences (not bridge strikes) | 404 |
| IV | Cutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure) | 340 |
| IA | Signal failure (including no fault found) | 260 |
| MD | Technical failures below the solebar | 44 |
| OU | Delays not Investigated by Network Rail | 33 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 31 |
| M8 | Technical failures above the Solebar | 24 |
| TH | (Senior) Conductor/Train Manager | 24 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 23 |
| IT | Rough ride or bumps reported - cause not known or no fault found | 22 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| JD | Structures - Bridges/tunnels/buildings/retaining walls/sea defences (not bridge strikes) | 4,422 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 2,087 |
| JS | Condition of Track TSR outside the Timetable Planning Rules | 1,886 |
| IV | Cutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure) | 1,866 |
| MD | Technical failures below the solebar | 1,520 |
| TG | Driver | 965 |
| IB | Points failure (including no fault found) | 914 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 796 |
| IA | Signal failure (including no fault found) | 625 |
| M8 | Technical failures above the Solebar | 614 |