195 delay minutes

Most of the delay picked up at Aylesbury Vale Parkway in the four weeks to 9 December 2023 came from the operators' own operations.

91% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideTrains cancelled
Network Rail's causes
Track--8%-
Signals, points and power126%16%-
Weather and structures--7%-
Autumn147%7%1
External--4%-
Network management116%17%-
The operators' causes
Train faults2312%16%1
Traincrew53%11%-
Stations53%3%-
Operations11961%5%-
Operator, other63%7%-

Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.

Period by period

Delay minutes a day, period by period. Gridlines every 5 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
TXDelays incurred on non-Network Rail running lines or networks including London Underground (except fleet related delays)114
MDTechnical failures below the solebar9
MUDepot operating problem9
OSLate start or delays to Railhead Conditioning or Ghost Train due to its own activity and not in reaction to another incident9
J0Telecom equipment radio failure (GSM-R)7
QJSpecial working for leaf-fall track circuit operation6
VXExternal events occurring on the LUL or other non NR running lines6
ILToken equipment failure (including no fault found)5
MNBrake and brake systems faults; including wheel flats where no other cause had been identified5
OEFailure to lay Sandite or operate Railhead Conditioning train as programmed5
Since 2018
CodeWhat Network Rail loggedMinutes
TXDelays incurred on non-Network Rail running lines or networks including London Underground (except fleet related delays)1,153
JSCondition of Track TSR outside the Timetable Planning Rules935
MDTechnical failures below the solebar545
ICTrack circuit failure (including no fault found)396
TGDriver388
MNBrake and brake systems faults; including wheel flats where no other cause had been identified270
MTConfirmed train borne safety system faults (not cab based)222
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure181
M8Technical failures above the Solebar178
M7Door and Door system faults159