CSV JSON

358 delay minutes

The biggest share (37%) of the delay picked up at Axminster in the four weeks to 9 December 2023 came from signal, points and power faults.

56% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideTrains cancelled
Network Rail's causes
Track--8%-
Signals, points and power13237%16%2
Weather and structures8724%7%4
Autumn123%7%-
External--4%-
Network management6418%17%7
The operators' causes
Train faults308%16%-
Traincrew144%11%-
Stations51%3%-
Operations--5%-
Operator, other144%7%-

Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.

Period by period

Delay minutes a day, period by period. Gridlines every 5 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure68
ICTrack circuit failure (including no fault found)64
JFOff track asset defects or issues on the NR network (not due to vandalism or weather or part of station infrastructure)54
IVCutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure)42
JKFlooding not due to exceptional weather32
MNBrake and brake systems faults; including wheel flats where no other cause had been identified30
X4Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions13
TH(Senior) Conductor/Train Manager10
ACWaiting Train preparation or completion of TOPS list/RT39738
ONDelays not properly investigated by Network Rail7
Since 2018
CodeWhat Network Rail loggedMinutes
I5Possession over-run from planned work387
X4Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions321
XWSevere weather not snow affecting infrastructure the responsibility of Network Rail265
IVCutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure)247
TGDriver191
TTLeaf fall Neutral183
J3Axle Counter Failure173
TITraincrew rostering problem135
ICTrack circuit failure (including no fault found)133
TATrain-crew/loco/stock/unit diagram issues127