Axminster
358 delay minutes
The biggest share (37%) of the delay picked up at Axminster in the four weeks to 9 December 2023 came from signal, points and power faults.
56% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | Trains cancelled |
|---|---|---|---|---|
| Network Rail's causes | ||||
| Track | - | - | 8% | - |
| Signals, points and power | 132 | 37% | 16% | 2 |
| Weather and structures | 87 | 24% | 7% | 4 |
| Autumn | 12 | 3% | 7% | - |
| External | - | - | 4% | - |
| Network management | 64 | 18% | 17% | 7 |
| The operators' causes | ||||
| Train faults | 30 | 8% | 16% | - |
| Traincrew | 14 | 4% | 11% | - |
| Stations | 5 | 1% | 3% | - |
| Operations | - | - | 5% | - |
| Operator, other | 14 | 4% | 7% | - |
Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 68 |
| IC | Track circuit failure (including no fault found) | 64 |
| JF | Off track asset defects or issues on the NR network (not due to vandalism or weather or part of station infrastructure) | 54 |
| IV | Cutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure) | 42 |
| JK | Flooding not due to exceptional weather | 32 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 30 |
| X4 | Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions | 13 |
| TH | (Senior) Conductor/Train Manager | 10 |
| AC | Waiting Train preparation or completion of TOPS list/RT3973 | 8 |
| ON | Delays not properly investigated by Network Rail | 7 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| I5 | Possession over-run from planned work | 387 |
| X4 | Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions | 321 |
| XW | Severe weather not snow affecting infrastructure the responsibility of Network Rail | 265 |
| IV | Cutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure) | 247 |
| TG | Driver | 191 |
| TT | Leaf fall Neutral | 183 |
| J3 | Axle Counter Failure | 173 |
| TI | Traincrew rostering problem | 135 |
| IC | Track circuit failure (including no fault found) | 133 |
| TA | Train-crew/loco/stock/unit diagram issues | 127 |