Aylesbury
851 delay minutes
The biggest share (48%) of the delay picked up at Aylesbury in the four weeks to 9 December 2023 came from track faults.
15% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 409 | 48% | 8% | 15 a day, the most in 5 years | - |
| Signals, points and power | 36 | 4% | 16% | 1 a day, the least in 5 years | 1 |
| Weather and structures | 3 | <1% | 7% | 0 a day, more than 3 of the other 4 years | - |
| Autumn | 158 | 19% | 7% | 6 a day, more than 3 of the other 4 years | 1 |
| External | 3 | <1% | 4% | 0 a day, more than 1 of the other 4 years | 1 |
| Network management | 42 | 5% | 17% | 2 a day, the least in 5 years | 1 |
| The operators' causes | |||||
| Train faults | 59 | 7% | 16% | 2 a day, the least in 5 years | 4 |
| Traincrew | 36 | 4% | 11% | 1 a day, the least in 5 years | 2 |
| Stations | 6 | <1% | 3% | 0 a day, the least in 5 years | - |
| Operations | 85 | 10% | 5% | 3 a day, the least in 5 years | 4 |
| Operator, other | 14 | 2% | 7% | 0 a day, the least in 5 years | 1 |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 363 |
| QJ | Special working for leaf-fall track circuit operation | 112 |
| TX | Delays incurred on non-Network Rail running lines or networks including London Underground (except fleet related delays) | 65 |
| JS | Condition of Track TSR outside the Timetable Planning Rules | 42 |
| TG | Driver | 32 |
| QI | Cautioning due to railhead leaf contamination | 29 |
| M7 | Door and Door system faults | 19 |
| IB | Points failure (including no fault found) | 18 |
| IC | Track circuit failure (including no fault found) | 18 |
| TZ | Other Passenger Train Operating Company causes | 18 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TX | Delays incurred on non-Network Rail running lines or networks including London Underground (except fleet related delays) | 4,514 |
| MD | Technical failures below the solebar | 3,901 |
| TG | Driver | 3,461 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 2,340 |
| IC | Track circuit failure (including no fault found) | 1,557 |
| M7 | Door and Door system faults | 1,277 |
| M8 | Technical failures above the Solebar | 1,265 |
| MT | Confirmed train borne safety system faults (not cab based) | 1,121 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 1,043 |
| RB | Passengers joining/alighting | 882 |