Leaves on the Line

Bache

BAC North West route
CSV JSON

0 delay minutes

No delay was picked up at Bache in the four weeks to 9 December 2023.

100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideTrains cancelled
Network Rail's causes
Track--8%-
Signals, points and power--16%-
Weather and structures--7%-
Autumn--7%-
External--4%-
Network management--17%-
The operators' causes
Train faults--16%-
Traincrew--11%-
Stations--3%-
Operations--5%-
Operator, other--7%-

Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.

Period by period

Delay minutes a day, period by period. Gridlines every 1 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
Nothing logged.
Since 2018
CodeWhat Network Rail loggedMinutes
IJAWS/ATP/TPWS/Train stop/On track equipment failure27
JXMiscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains)20
ICTrack circuit failure (including no fault found)12
MDTechnical failures below the solebar9
MTConfirmed train borne safety system faults (not cab based)9
TGDriver6
IBPoints failure (including no fault found)5
MNBrake and brake systems faults; including wheel flats where no other cause had been identified3