1,245 delay minutes

The biggest share (30%) of the delay picked up at Banbury in the four weeks to 9 December 2023 came from faulty trains.

49% of these minutes were knock-on from something that happened elsewhere first. 96% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track554%8% 2 a day, more than 1 of the other 4 years-
Signals, points and power17014%16% 6 a day, more than 2 of the other 4 years1
Weather and structures8<1%7% 0 a day, the least in 5 years-
Autumn10<1%7% 0 a day, more than 1 of the other 4 years-
External1179%4% 4 a day, the most in 5 years1
Network management23519%17% 8 a day, more than 3 of the other 4 years2
The operators' causes
Train faults37530%16% 13 a day, the most in 5 years8
Traincrew988%11% 4 a day, more than 1 of the other 4 years6
Stations353%3% 1 a day, more than 2 of the other 4 years-
Operations212%5% 1 a day, more than 2 of the other 4 years2
Operator, other12110%7% 4 a day, the most in 5 years-

Period by period

Delay minutes a day, period by period. Gridlines every 20 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
XPBRIDGE HIT117
MUDepot operating problem109
OUDelays not Investigated by Network Rail74
MNBrake and brake systems faults; including wheel flats where no other cause had been identified66
IASignal failure (including no fault found)65
M7Door and Door system faults63
IBPoints failure (including no fault found)60
TGDriver59
MDTechnical failures below the solebar56
I5Possession over-run from planned work54
Since 2018
CodeWhat Network Rail loggedMinutes
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.6,024
TGDriver3,743
MDTechnical failures below the solebar3,101
MCDiesel Loco failure, defect, attention3,011
ICTrack circuit failure (including no fault found)2,906
IBPoints failure (including no fault found)2,719
J3Axle Counter Failure2,416
MNBrake and brake systems faults; including wheel flats where no other cause had been identified2,385
IVCutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure)2,170
OCSignaller including mis-routing (not ERTM /ETCS related)1,640