Barton-on-Humber
967 delay minutes
The biggest share (33%) of the delay picked up at Barton-on-Humber in the four weeks to 9 December 2023 came from outside causes like vandalism, cable theft, animals and fires.
84% of these minutes were knock-on from something that happened elsewhere first. 77% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 41 | 4% | 8% | 1 a day, more than 3 of the other 4 years | - |
| Signals, points and power | 12 | 1% | 16% | 0 a day, the least in 5 years | - |
| Weather and structures | 7 | <1% | 7% | 0 a day, more than 3 of the other 4 years | - |
| Autumn | 170 | 18% | 7% | 6 a day, the most in 5 years | 1 |
| External | 315 | 33% | 4% | 11 a day, the most in 5 years | 2 |
| Network management | 206 | 21% | 17% | 7 a day, the most in 5 years | - |
| The operators' causes | |||||
| Train faults | 44 | 5% | 16% | 2 a day, more than 3 of the other 4 years | 1 |
| Traincrew | 55 | 6% | 11% | 2 a day, the most in 5 years | 2 |
| Stations | 3 | <1% | 3% | 0 a day, more than 1 of the other 4 years | - |
| Operations | - | - | 5% | 0 a day, the least in 5 years | 1 |
| Operator, other | 116 | 12% | 7% | 4 a day, the most in 5 years | 3 |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| XN | Road or crossing related incidents inc. cars on line, crossing misuse and priority to emergency services (NOT bridge strikes) | 312 |
| OT | Ops Safety TSR implemented for sighting issues relating to foot crossings, level crossings or signals (Not vegetation caused) | 186 |
| Q3 | NZ Pumps T | 106 |
| TT | Leaf fall Neutral | 55 |
| MP | Rail / wheel interface, adhesion problems (including ice on the running rail) | 51 |
| QJ | Special working for leaf-fall track circuit operation | 49 |
| TG | Driver | 34 |
| M8 | Technical failures above the Solebar | 32 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 31 |
| TH | (Senior) Conductor/Train Manager | 21 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 1,531 |
| ID | Level crossing faults and failure incl. barrow/foot crossings and crossing treadles | 1,140 |
| OT | Ops Safety TSR implemented for sighting issues relating to foot crossings, level crossings or signals (Not vegetation caused) | 1,039 |
| MD | Technical failures below the solebar | 959 |
| Q3 | NZ Pumps T | 801 |
| TT | Leaf fall Neutral | 708 |
| XN | Road or crossing related incidents inc. cars on line, crossing misuse and priority to emergency services (NOT bridge strikes) | 679 |
| TO | Time lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility) | 662 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 643 |
| M8 | Technical failures above the Solebar | 607 |