Leaves on the Line

Barton-on-Humber

BAU North & East route
CSV JSON

967 delay minutes

The biggest share (33%) of the delay picked up at Barton-on-Humber in the four weeks to 9 December 2023 came from outside causes like vandalism, cable theft, animals and fires.

84% of these minutes were knock-on from something that happened elsewhere first. 77% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track414%8% 1 a day, more than 3 of the other 4 years-
Signals, points and power121%16% 0 a day, the least in 5 years-
Weather and structures7<1%7% 0 a day, more than 3 of the other 4 years-
Autumn17018%7% 6 a day, the most in 5 years1
External31533%4% 11 a day, the most in 5 years2
Network management20621%17% 7 a day, the most in 5 years-
The operators' causes
Train faults445%16% 2 a day, more than 3 of the other 4 years1
Traincrew556%11% 2 a day, the most in 5 years2
Stations3<1%3% 0 a day, more than 1 of the other 4 years-
Operations--5% 0 a day, the least in 5 years1
Operator, other11612%7% 4 a day, the most in 5 years3

Period by period

Delay minutes a day, period by period. Gridlines every 10 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
XNRoad or crossing related incidents inc. cars on line, crossing misuse and priority to emergency services (NOT bridge strikes)312
OTOps Safety TSR implemented for sighting issues relating to foot crossings, level crossings or signals (Not vegetation caused)186
Q3NZ Pumps T106
TTLeaf fall Neutral55
MPRail / wheel interface, adhesion problems (including ice on the running rail)51
QJSpecial working for leaf-fall track circuit operation49
TGDriver34
M8Technical failures above the Solebar32
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.31
TH(Senior) Conductor/Train Manager21
Since 2018
CodeWhat Network Rail loggedMinutes
TGDriver1,531
IDLevel crossing faults and failure incl. barrow/foot crossings and crossing treadles1,140
OTOps Safety TSR implemented for sighting issues relating to foot crossings, level crossings or signals (Not vegetation caused)1,039
MDTechnical failures below the solebar959
Q3NZ Pumps T801
TTLeaf fall Neutral708
XNRoad or crossing related incidents inc. cars on line, crossing misuse and priority to emergency services (NOT bridge strikes)679
TOTime lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility)662
OCSignaller including mis-routing (not ERTM /ETCS related)643
M8Technical failures above the Solebar607