Leaves on the Line

Blackwater

BAW Wessex route
CSV JSON

0 delay minutes

No delay was picked up at Blackwater in the four weeks to 9 December 2023.

100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideTrains cancelled
Network Rail's causes
Track--8%-
Signals, points and power--16%-
Weather and structures--7%-
Autumn--7%-
External--4%-
Network management--17%-
The operators' causes
Train faults--16%-
Traincrew--11%-
Stations--3%-
Operations--5%-
Operator, other--7%-

Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.

Period by period

Delay minutes a day, period by period. Gridlines every 2 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
Nothing logged.
Since 2018
CodeWhat Network Rail loggedMinutes
OKDelay caused by Operating staff oversight, issues or absence (excluding signallers and Control)180
TGDriver128
TATrain-crew/loco/stock/unit diagram issues101
QMTrain schedule/STP Process including erroneous simplifiers92
ZUNo Cause Identified After investigation by both Parties80
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.79
XWSevere weather not snow affecting infrastructure the responsibility of Network Rail42
FOTime Lost en-route believed to be operator cause and information required from Operator (Ops Responsibility)40
OCSignaller including mis-routing (not ERTM /ETCS related)38
TH(Senior) Conductor/Train Manager35