Leaves on the Line

Burscough Bridge

BCB North West route
CSV JSON

640 delay minutes

The biggest share (19%) of the delay picked up at Burscough Bridge in the four weeks to 9 December 2023 came from autumn leaves.

36% of these minutes were knock-on from something that happened elsewhere first. 95% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track5<1%8% 0 a day, more than 3 of the other 4 years-
Signals, points and power81%16% 0 a day, the least in 5 years-
Weather and structures71%7% 0 a day, more than 2 of the other 4 years-
Autumn12219%7% 4 a day, more than 2 of the other 4 years-
External488%4% 2 a day, more than 3 of the other 4 years-
Network management8513%17% 3 a day, the most in 5 years-
The operators' causes
Train faults9114%16% 3 a day, more than 1 of the other 4 years-
Traincrew6410%11% 2 a day, the most in 5 years-
Stations152%3% 1 a day, more than 1 of the other 4 years-
Operations8513%5% 3 a day, more than 2 of the other 4 years-
Operator, other11117%7% 4 a day, more than 2 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 10 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
Q3NZ Pumps T111
TTLeaf fall Neutral109
TOTime lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility)55
XNRoad or crossing related incidents inc. cars on line, crossing misuse and priority to emergency services (NOT bridge strikes)48
MDTechnical failures below the solebar45
TGDriver45
M7Door and Door system faults31
OUDelays not Investigated by Network Rail25
OCSignaller including mis-routing (not ERTM /ETCS related)23
TZOther Passenger Train Operating Company causes20
Since 2018
CodeWhat Network Rail loggedMinutes
TOTime lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility)3,569
MDTechnical failures below the solebar2,753
TGDriver2,563
Q3NZ Pumps T1,093
RBPassengers joining/alighting887
TTLeaf fall Neutral749
TH(Senior) Conductor/Train Manager685
M7Door and Door system faults675
MSPlanned underpowered or shortformed service and or vehicle, incl. exam set swaps669
RCre-booked assistance for a person with reduced mobility joining/alighting,650