358 delay minutes

The biggest share (20%) of the delay picked up at Bracknell in the four weeks to 9 December 2023 came from signal, points and power faults.

67% of these minutes were knock-on from something that happened elsewhere first. 99% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track72%8% 0 a day, more than 1 of the other 4 years-
Signals, points and power7220%16% 3 a day, more than 3 of the other 4 years-
Weather and structures--7% 0 a day, the least in 5 years-
Autumn3610%7% 1 a day, more than 2 of the other 4 years-
External113%4% 0 a day, more than 3 of the other 4 years-
Network management4914%17% 2 a day, more than 1 of the other 4 years-
The operators' causes
Train faults4312%16% 2 a day, the most in 5 years1
Traincrew308%11% 1 a day, more than 2 of the other 4 years1
Stations3610%3% 1 a day, more than 3 of the other 4 years-
Operations339%5% 1 a day, the most in 5 years-
Operator, other4111%7% 1 a day, more than 3 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 10 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
I4OHLE/third rail power supply failure or reduction72
Q3NZ Pumps T33
TTLeaf fall Neutral33
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)32
MNBrake and brake systems faults; including wheel flats where no other cause had been identified22
TGDriver16
TATrain-crew/loco/stock/unit diagram issues15
FOTime Lost en-route believed to be operator cause and information required from Operator (Ops Responsibility)12
M7Door and Door system faults10
RQUn-booked assistance for a person with reduced mobility joining/alighting,9
Since 2018
CodeWhat Network Rail loggedMinutes
OTOps Safety TSR implemented for sighting issues relating to foot crossings, level crossings or signals (Not vegetation caused)2,127
ICTrack circuit failure (including no fault found)1,253
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)954
TGDriver889
IDLevel crossing faults and failure incl. barrow/foot crossings and crossing treadles729
VHPassenger Communication cord, door egress or emergency train alarm operated607
OCSignaller including mis-routing (not ERTM /ETCS related)586
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.571
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure570
IBPoints failure (including no fault found)423